Back to bathroom remodel contractors
Zarc Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2018 to Aug 2026
- Last 24 months
- 13 permits filed
66 permits since 2000: 48 completed, 7 in progress, 7 never finaled, 4 expired or cancelled.
Of the 7 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 22 completed, 4 in progress, 2 never finaled, 1 expired or cancelled. Typically 13 days from filing to permit and 206 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2026 | In progress issued Aug 2026 | 917 Rolph St | remodel 1 bathroom, all fictures to remain in same location, update electrical sub panel, and install new furnace in garage (replacement). kitchen remodel, new counter tops, sink and faucetDetails
remodel 1 bathroom, all fictures to remain in same location, update electrical sub panel, and install new furnace in garage (replacement). kitchen remodel, new counter tops, sink and faucet | $37,800 |
| Jun 26, 2026 | In progress issued Jun 2026 | 35 Valparaiso St | unit 35: remodel (e) kitchen & bathroom. update kitchen w/new appliances, kitchen cabinets & flooring. install (8) new recessed lights. upgrade electrical & replace subpanels & breakers. unit 37: remodel (e) bathroom & update electrical wiring, subpanel & breakers.Details
unit 35: remodel (e) kitchen & bathroom. update kitchen w/new appliances, kitchen cabinets & flooring. install (8) new recessed lights. upgrade electrical & replace subpanels & breakers. unit 37: remodel (e) bathroom & update electrical wiring, subpanel & breakers. | $73,000 |
| Apr 27, 2026 | Completed final sign-off Aug 2026 | 130 Midcrest Wy | remodel existing kitchen and one bathroom, at kitchen appliances and sink to remain in existing locations, at bathroom relocate existing vanity and shower.Details
remodel existing kitchen and one bathroom, at kitchen appliances and sink to remain in existing locations, at bathroom relocate existing vanity and shower. | $32,000 |
| Dec 29, 2025 | Completed final sign-off Aug 2026 | 701 Anderson St | remodel (1) (e) full bathroom including (1) sink, (1) shower, (1) toilet and vanity. all (e) locations to remain, no wall demolition or construction. remove and replace (e) furnace and all ducts. repair (e) backyard staircase, less than 50% dryrot repair. less than 25' of (n) duct.Details
remodel (1) (e) full bathroom including (1) sink, (1) shower, (1) toilet and vanity. all (e) locations to remain, no wall demolition or construction. remove and replace (e) furnace and all ducts. repair (e) backyard staircase, less than 50% dryrot repair. less than 25' of (n) duct. | $21,000 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 1252 48th Av | unit#5: kitchen and one bathroom remodel, all appliances and tub, toilet, and sinks to remain in existing locations, replace (1) subpanel and breakers. kitchen and bathroom remodel in kind. kitchen approx. 90 sq ft. bathroom approx. 50 sq ft.Details
unit#5: kitchen and one bathroom remodel, all appliances and tub, toilet, and sinks to remain in existing locations, replace (1) subpanel and breakers. kitchen and bathroom remodel in kind. kitchen approx. 90 sq ft. bathroom approx. 50 sq ft. | $12,000 |
| Jun 12, 2025 | Completed final sign-off Jan 2026 | 38 Broderick St | interior remodel of kitchen and remodel of 1 full bath and 1 half bath to full bathroom. remove and install new appliances. no replacement of windowsDetails
interior remodel of kitchen and remodel of 1 full bath and 1 half bath to full bathroom. remove and install new appliances. no replacement of windows | $62,000 |
| Oct 4, 2024 | In progress issued Feb 2025 | 65 Aerial Wy | alter site permit 202209082081-s: interior remodel at 1/f - remove service stair, remove garage post, install new beam. interior remodel at 2/f - remodel kitchen and 2 bathrooms, fill in service stair flr opening and service stair door opening. other - replace all windows in (e) rough openings.Details
alter site permit 202209082081-s: interior remodel at 1/f - remove service stair, remove garage post, install new beam. interior remodel at 2/f - remodel kitchen and 2 bathrooms, fill in service stair flr opening and service stair door opening. other - replace all windows in (e) rough openings. | |
| Jan 17, 2024 | In progress issued Feb 2024 | 353 14th Av | 1/f interior remodel: dig down sunroom/raise up garage area to match (e) storage room ceiling height (7'6") @ 1/f. adding a new stairway to 2/f, adding 2 new full baths; 1/f study room: relocate entry from yard, adding retaining wall for stairway to yard, 4/f: adding a new roof deck.Details
1/f interior remodel: dig down sunroom/raise up garage area to match (e) storage room ceiling height (7'6") @ 1/f. adding a new stairway to 2/f, adding 2 new full baths; 1/f study room: relocate entry from yard, adding retaining wall for stairway to yard, 4/f: adding a new roof deck. | $80,000 |
| Mar 10, 2023 | Completed final sign-off Apr 2025 | 1629 Taylor St | unit 1: replace int stairs, remodel kitchen/bath, add window to entry vest., add powder rm, relocate laundry/water heater; unit 2: relocate/remodel kitchen, add laundry to (e)bath, reframe int stair, remodel (e)bath upstairs. no ext work to facadeDetails
unit 1: replace int stairs, remodel kitchen/bath, add window to entry vest., add powder rm, relocate laundry/water heater; unit 2: relocate/remodel kitchen, add laundry to (e)bath, reframe int stair, remodel (e)bath upstairs. no ext work to facade | $418,000 |
| Jan 18, 2023 | Completed final sign-off Aug 2023 | 2327 Clement St | 2327- 2329 clement: remodeling existing half bath includes: 1 tub replacement inn existing location, 1 vanity, add (1) new vent, replace (1) sink and faucet.Details
2327- 2329 clement: remodeling existing half bath includes: 1 tub replacement inn existing location, 1 vanity, add (1) new vent, replace (1) sink and faucet. | $6,250 |
| Jan 4, 2023 | Completed final sign-off Mar 2025 | 3250 Ortega St | prove new habitable area @ 1st fl (living rm + (2) bedrooms) with access to the rear yard. 1st fl rear in-fill area below the (e) 2nd fl rear area. remodel (e) 2nd fk to include a (n) full bathroom, closet, bedroom + powder rm. provide a (n) fence gate at the (e) fence along the south property line.Details
prove new habitable area @ 1st fl (living rm + (2) bedrooms) with access to the rear yard. 1st fl rear in-fill area below the (e) 2nd fl rear area. remodel (e) 2nd fk to include a (n) full bathroom, closet, bedroom + powder rm. provide a (n) fence gate at the (e) fence along the south property line. | $105,000 |
| Oct 3, 2022 | Completed final sign-off Jan 2023 | 354 05th Av | remodel (e) kitchen: new kitchen cabinets, sink, faucet and replace (e) appliances. in bathroom: replace (e) vanity and tub. replace in kindDetails
remodel (e) kitchen: new kitchen cabinets, sink, faucet and replace (e) appliances. in bathroom: replace (e) vanity and tub. replace in kind | $18,700 |
| Sep 8, 2022 | Never finaled issued Aug 2023, no final | 65 Aerial Wy | exterior one story horizontal side yard addition to the main entry of an (e)two story residence.interior remodel @ 1st fl,remove (e)stair,(n) interior stair,replace all windows,remodel kitchen,remodel all 3 baths.Details
exterior one story horizontal side yard addition to the main entry of an (e)two story residence.interior remodel @ 1st fl,remove (e)stair,(n) interior stair,replace all windows,remodel kitchen,remodel all 3 baths. | $190,000 |
| Jan 20, 2022 | Completed final sign-off Apr 2022 | 224 Warren Dr | interior work, bathroom remodel in kind and relocating interior non-bearing wall. cleaned up finishes.Details
interior work, bathroom remodel in kind and relocating interior non-bearing wall. cleaned up finishes. | $8,750 |
| Dec 2, 2021 | Completed final sign-off Jul 2022 | 855 Folsom St | unit 307: remodel (1) full bathroom and (1) half bathroom. both are existing. in full bath, convert to shower, all toilets and vanity to remain in existing locations. remove and install new vinyl flooring in living space.Details
unit 307: remodel (1) full bathroom and (1) half bathroom. both are existing. in full bath, convert to shower, all toilets and vanity to remain in existing locations. remove and install new vinyl flooring in living space. | $17,000 |
| Nov 16, 2021 | Completed final sign-off Jul 2024 | 2681 22nd Av | 1st fl: reconfigure e interior space to become 2 new bedrooms, 2 baths, playroom, and laundry and storage. 2nd fl remodel kitchen area and bath. add new bath. replace new staircase down to 1st fl and stairwell. infill e courtyard.Details
1st fl: reconfigure e interior space to become 2 new bedrooms, 2 baths, playroom, and laundry and storage. 2nd fl remodel kitchen area and bath. add new bath. replace new staircase down to 1st fl and stairwell. infill e courtyard. | $180,000 |
| Sep 7, 2021 | Completed final sign-off Feb 2024 | 162 Funston Av | new addition at the third floor rear. new addition and adjacent existing area to include a bedroom, remodel and expand the existing bathroom, and two closets. work at the existing areas of the 1st and 2nd floor to provide new structural posts and shear walls required for new 3rd floor addition.Details
new addition at the third floor rear. new addition and adjacent existing area to include a bedroom, remodel and expand the existing bathroom, and two closets. work at the existing areas of the 1st and 2nd floor to provide new structural posts and shear walls required for new 3rd floor addition. | $55,000 |
| Aug 19, 2021 | Completed final sign-off Oct 2021 | 2231 46th Av | bathroom: remove/replace (e) tub and replace with new shower and replace (e) existing vanity and sink. one bathroom reodel. replace 1 exhaust fan.Details
bathroom: remove/replace (e) tub and replace with new shower and replace (e) existing vanity and sink. one bathroom reodel. replace 1 exhaust fan. | $5,200 |
| May 10, 2021 | Completed final sign-off Dec 2021 | 1800 Larkin St | 1 kitchen, 1 bathroom update, kitchen replace cabinets, counter top and backsplash. bathroom replace 1 vanity and tile. all appliances, toilet, shower and sink to remain in existing. no structural work.Details
1 kitchen, 1 bathroom update, kitchen replace cabinets, counter top and backsplash. bathroom replace 1 vanity and tile. all appliances, toilet, shower and sink to remain in existing. no structural work. | $18,700 |
| Mar 17, 2021 | Completed final sign-off Dec 2022 | 77 Christopher Dr | 2nd floor remodel. 3 bed/2 bath, kitchen, dining, living reconfiguration. add deck at 2nd floor with structural strengthening. new skylights above kitchen.Details
2nd floor remodel. 3 bed/2 bath, kitchen, dining, living reconfiguration. add deck at 2nd floor with structural strengthening. new skylights above kitchen. | $189,000 |
| Mar 12, 2021 | Completed final sign-off Aug 2021 | 1494 Funston Av | bathroom & kitchen remodel in kind. same layout & locaton. new lighting shall comply with cec 150.0(k)3 & (k)5.Details
bathroom & kitchen remodel in kind. same layout & locaton. new lighting shall comply with cec 150.0(k)3 & (k)5. | $15,000 |
| Jan 7, 2021 | Completed final sign-off Mar 2022 | 1310 38th Av | 1st floor: remodel (e) bathroom and bedroom. modify (e) storage to family rom and walk-in.Details
1st floor: remodel (e) bathroom and bedroom. modify (e) storage to family rom and walk-in. | $68,000 |
| Dec 3, 2020 | Completed final sign-off Nov 2021 | 1307 06th Av | new electrical upgrade for subpanel.remove/replace insulation throughout unit to comply w/ energy compliance.kitchen remodel with open design.rmeovel (e) full bathrom & convert (e) powder room to new full bath. replace windows & int. plaster wall.Details
new electrical upgrade for subpanel.remove/replace insulation throughout unit to comply w/ energy compliance.kitchen remodel with open design.rmeovel (e) full bathrom & convert (e) powder room to new full bath. replace windows & int. plaster wall. | $30,000 |
| Feb 18, 2020 | Completed final sign-off Jul 2020 | 1645 Hyde St | unit 4: remodel existing bathroom and kitchen. all kitchen appliances to remain in existing locations. same with all bathroom fixtures. scope to include new tile, install new appliances, new toilet, vanity and electrical upgrade. patch and repair sheetrock as needed. no wall removal.Details
unit 4: remodel existing bathroom and kitchen. all kitchen appliances to remain in existing locations. same with all bathroom fixtures. scope to include new tile, install new appliances, new toilet, vanity and electrical upgrade. patch and repair sheetrock as needed. no wall removal. | $39,500 |
| Dec 4, 2019 | Expired or cancelled cancelled Jan 2026 | 326 01st St | as built revision pa# 2015-0515-6452: no change to kitchen, bathroom, and entranceDetails
as built revision pa# 2015-0515-6452: no change to kitchen, bathroom, and entrance | $12,500 |
| Jun 25, 2019 | Completed final sign-off Nov 2019 | 2651 Leavenworth St | remodel existing 2nd floor unit 2651: work including remodel bathroom kitchen laundry and new half bathroom.Details
remodel existing 2nd floor unit 2651: work including remodel bathroom kitchen laundry and new half bathroom. | $30,000 |
| Jun 12, 2019 | Completed final sign-off Oct 2019 | 1637 Hyde St | apt 3: remodel (e) bathroom & kitchen. all appliances & bathroom fixtures to remain in (e) locations. scope to include new tile, appliances, toilet, vanity & upgrade electrical. also, sheetrock repair & paint counter only.Details
apt 3: remodel (e) bathroom & kitchen. all appliances & bathroom fixtures to remain in (e) locations. scope to include new tile, appliances, toilet, vanity & upgrade electrical. also, sheetrock repair & paint counter only. | $38,000 |
| Nov 9, 2018 | Never finaled issued Jan 2020, no final | 522 29th Av | legalize unit on ground flr behind garage w/ family room, kitchen, bathroom and bedroom per ord# 43-14. to comply w/ nov# 201869831.Details
legalize unit on ground flr behind garage w/ family room, kitchen, bathroom and bedroom per ord# 43-14. to comply w/ nov# 201869831. | $10,000 |
| Aug 28, 2018 | Completed final sign-off Jul 2019 | 37 Guerrero St | remodel (e) unit (37 guerrero st), work including new wiring, lighting; remodel kitchen, new bathroom and remodel (e) bathroomDetails
remodel (e) unit (37 guerrero st), work including new wiring, lighting; remodel kitchen, new bathroom and remodel (e) bathroom | $35,000 |