Zakskorn Construction Dba Zcon Builders
- Based in
- Oakland
- On San Francisco permits
- Mar 2001 to May 2017
- Last 24 months
- 0 permits filed
10 permits since 2000: 5 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2017 | Never finaled issued May 2017, no final | 900 Folsom St | grnd flr: construct interior demising wall 2x6 metal stud 5/8" gb each side w/ insulation maher naDetails
grnd flr: construct interior demising wall 2x6 metal stud 5/8" gb each side w/ insulation maher na | $10,000 |
| Sep 19, 2016 | Never finaled issued Nov 2016, no final | 900 Folsom St | a single non-load bearing partitionDetails
a single non-load bearing partition | $6,800 |
| Apr 22, 2008 | Completed final sign-off May 2008 | 1521 Sutter St | renew pa# 2006/06/07/3423, pa# 2006/02/07/3928 & pa# 2007/06/12/3675 for final inspection. note: sp insp reqd pa# 2006/06/07/3423.Details
renew pa# 2006/06/07/3423, pa# 2006/02/07/3928 & pa# 2007/06/12/3675 for final inspection. note: sp insp reqd pa# 2006/06/07/3423. | |
| Jun 12, 2007 | Expired or cancelled expired May 2008 | 1521 Sutter St | revision to permit 200411290175 to buiod 28 untis, revision to enclose bridges btwn bldx at levels 3,4 & 5 only.Details
revision to permit 200411290175 to buiod 28 untis, revision to enclose bridges btwn bldx at levels 3,4 & 5 only. | $5,600,000 |
| Jun 7, 2006 | Expired or cancelled expired May 2008 | 1521 Sutter St | structural addendum to original permit - original permit# 2004/11/29/0175 issued 11/8/05.Details
structural addendum to original permit - original permit# 2004/11/29/0175 issued 11/8/05. | |
| Sep 23, 2004 | Expired or cancelled withdrawn Oct 2004 | 1 Union St | oti-1 2nd floor me, el, sp, l/sDetails
oti-1 2nd floor me, el, sp, l/s | $280,000 |
| Oct 17, 2003 | Completed final sign-off Apr 2005 | 1 Union St | oti-4 3rd floor-elDetails
oti-4 3rd floor-el | $100,000 |
| Sep 10, 2003 | Completed final sign-off Jan 2004 | 1 Union St | oti-1 3rd floor, el, me, l/s, spDetails
oti-1 3rd floor, el, me, l/s, sp | $700,000 |
| Aug 20, 2003 | Completed final sign-off Jan 2004 | 1 Union St | demo 3rd fl,nonbearing office partitions, mech ductwork &electrical conduits&receptacles,carpet fl.Details
demo 3rd fl,nonbearing office partitions, mech ductwork &electrical conduits&receptacles,carpet fl. | $32,000 |
| Mar 28, 2001 | Completed final sign-off May 2001 | 30 Hotaling Pl | enlarge 1 room within the existing office space remove 1 wall build addtl walls patch flr pnt 3rd flDetails
enlarge 1 room within the existing office space remove 1 wall build addtl walls patch flr pnt 3rd fl | $19,800 |