Back to kitchen remodel contractors
Z M General Contractor Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Feb 2022
- Last 24 months
- 0 permits filed
15 permits since 2000: 14 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 24 days from filing to permit and 157 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2022 | Completed final sign-off Apr 2023 | 751 38th Av | 1/f: add 1 bedroom, family and 1.5 bath. 2/f: remodel kitchen, bathroom, add 1 full bathrom, add new deck, replace garage door. replace all front windows with in-kind (alum clad wood).Details
1/f: add 1 bedroom, family and 1.5 bath. 2/f: remodel kitchen, bathroom, add 1 full bathrom, add new deck, replace garage door. replace all front windows with in-kind (alum clad wood). | $70,000 |
| Dec 6, 2018 | Completed final sign-off Oct 2019 | 649 27th Av | 1st fl: add 2 bedrooms, 2 full baths, 1 family and wetbar. 2nd fl: remodel kitchen and bath. add 1.5 bath and laundry. infill south lightwell.Details
1st fl: add 2 bedrooms, 2 full baths, 1 family and wetbar. 2nd fl: remodel kitchen and bath. add 1.5 bath and laundry. infill south lightwell. | $100,000 |
| Jul 10, 2018 | Completed final sign-off Jan 2019 | 3075 24th Av | 1st fl, add 1 bedroom, 1 den, 2 full baths and family rm, 2nd fl, remodel kitchen and bath. add 1 full bath, 1 bedroom. replace front 2 windows on 2nd fl in kind with luminum clad woodDetails
1st fl, add 1 bedroom, 1 den, 2 full baths and family rm, 2nd fl, remodel kitchen and bath. add 1 full bath, 1 bedroom. replace front 2 windows on 2nd fl in kind with luminum clad wood | $100,000 |
| Feb 9, 2018 | Completed final sign-off Jun 2018 | 758 26th Av | replace (e) kitchen cabinets with new cabinets, countertop, flooring and new range dishwasher. repair (e) window, repair leaking bath plumbing. (all work within (e) building envelope)Details
replace (e) kitchen cabinets with new cabinets, countertop, flooring and new range dishwasher. repair (e) window, repair leaking bath plumbing. (all work within (e) building envelope) | $20,000 |
| Sep 29, 2014 | Never finaled issued May 2015, no final | 1507 33rd Av | legalize kitchen area install upgrade 50 amp for stove 2 gfci outlet and hood vent to exteriorDetails
legalize kitchen area install upgrade 50 amp for stove 2 gfci outlet and hood vent to exterior | $1,550 |
| Jul 2, 2012 | Completed final sign-off Aug 2012 | 265 Hahn St | kitchen & bathroom remodel - replace cabinet, tile floor, electrical/plumbing fixtures), high efficacy lighting.Details
kitchen & bathroom remodel - replace cabinet, tile floor, electrical/plumbing fixtures), high efficacy lighting. | $11,500 |