Back to bathroom remodel contractors
Z Construction Company Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2026
- Last 24 months
- 4 permits filed
97 permits since 2000: 66 completed, 5 in progress, 10 never finaled, 16 expired or cancelled.
Of the 10 never-finaled permits, 3 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
33 bathroom remodel permits: 25 completed, 4 in progress, 1 never finaled, 3 expired or cancelled. Typically 8 days from filing to permit and 171 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2026 | In progress issued Sep 2026 | 178 Lomita Av | 1st fl: convert existing storage to bedroom, family room with wet bar, full bathroom #4 for 327sqft. 2nd fl: remodel kitchen, add island, demo existing fireplace, replace with new electrical fireplace. 3rd fl: add a free standing tub to existing bathroom #1. legalize existing bathroom #3. remodel...Details
1st fl: convert existing storage to bedroom, family room with wet bar, full bathroom #4 for 327sqft. 2nd fl: remodel kitchen, add island, demo existing fireplace, replace with new electrical fireplace. 3rd fl: add a free standing tub to existing bathroom #1. legalize existing bathroom #3. remodel... | $150,000 |
| Jul 14, 2026 | In progress issued Jul 2026 | 178 Lomita Av | bathroom remodel, replace toilet, sink, vanity and finishes in kind.Details
bathroom remodel, replace toilet, sink, vanity and finishes in kind. | $5,000 |
| Jun 18, 2025 | In progress issued Jun 2025 | 735 16th Av | revision to pa #202401304936. change window to sliding door at a window of north side, add retaining wall and deck less than 30" ht abv grade at rear on 1st floor. no shed in yard. change layout in bathroom on 2nd floor.Details
revision to pa #202401304936. change window to sliding door at a window of north side, add retaining wall and deck less than 30" ht abv grade at rear on 1st floor. no shed in yard. change layout in bathroom on 2nd floor. | $5,000 |
| Jan 30, 2024 | In progress issued Apr 2024 | 735 16th Av | relocate kitchen & stairs; remodel bath, living & dining; add a full bath & 1/2 bath.add skylights on 2/f.remove stairs;legalize beds,full bth & family; infill lightwell & add full bath on 1/f. replace w/ wood doors,alum wood-clad wdws at front; replace roof; add shedd less than 8' ht & <100sf.Details
relocate kitchen & stairs; remodel bath, living & dining; add a full bath & 1/2 bath.add skylights on 2/f.remove stairs;legalize beds,full bth & family; infill lightwell & add full bath on 1/f. replace w/ wood doors,alum wood-clad wdws at front; replace roof; add shedd less than 8' ht & <100sf. | $250,000 |
| May 27, 2022 | Completed final sign-off Sep 2024 | 180 Yerba Buena Av | remodel all floors of (e) 3 story sfr. remodel (e) kitchen, powder room, and all bedrooms,1 bath rm to be added on the upper fl. one powder rm on the main fl. update all elect, mech, & plumb, and finishes. solarioum under separate permitDetails
remodel all floors of (e) 3 story sfr. remodel (e) kitchen, powder room, and all bedrooms,1 bath rm to be added on the upper fl. one powder rm on the main fl. update all elect, mech, & plumb, and finishes. solarioum under separate permit | $65,000 |
| Apr 1, 2022 | Completed final sign-off Jul 2023 | 315 Bay St | 2nd fl: demolition of selected (e) non-load bearing partitions, including doors & frames, flooring, casework, lighting & bathrooms. new work includes new partitions, millworks, gyp bd, ceiling, floor finishes & new bathrooms.Details
2nd fl: demolition of selected (e) non-load bearing partitions, including doors & frames, flooring, casework, lighting & bathrooms. new work includes new partitions, millworks, gyp bd, ceiling, floor finishes & new bathrooms. | $199,000 |
| Mar 23, 2022 | Expired or cancelled expired Sep 2024 | 180 Yerba Buena Av | one bathroom remodel. no changing of layout, no electrical wire and plumbing piping work. replace sink, toilet, tiles only. 8' x 10'Details
one bathroom remodel. no changing of layout, no electrical wire and plumbing piping work. replace sink, toilet, tiles only. 8' x 10' | $8,000 |
| Oct 5, 2020 | Completed final sign-off Jan 2021 | 1250 33rd Av | construct 1 new full bathroom & remodel (e) bathroom. all work on 3rd floor.Details
construct 1 new full bathroom & remodel (e) bathroom. all work on 3rd floor. | $20,000 |
| Jun 26, 2020 | Completed final sign-off Sep 2020 | 1062 Sanchez St | remove existing bathroom 5'x8' tub, toilet, sink and floor/wall tile. install new shower, toilet, sink & floor.tile. same layout no frame work.Details
remove existing bathroom 5'x8' tub, toilet, sink and floor/wall tile. install new shower, toilet, sink & floor.tile. same layout no frame work. | $5,000 |
| Feb 4, 2019 | Completed final sign-off Mar 2019 | 471 Lakeshore Dr | interior remodel on building 2/f, add new bathroom, no work to be done on (e) ground floorDetails
interior remodel on building 2/f, add new bathroom, no work to be done on (e) ground floor | $15,000 |
| Jul 17, 2018 | Completed final sign-off Jan 2019 | 15 Clearfield Dr | 2nd flr - add one (n) full bath, add (n) windowDetails
2nd flr - add one (n) full bath, add (n) window | $20,000 |
| Jul 11, 2018 | Completed final sign-off Jan 2019 | 18 Robblee Av | add family room, 1 office and bath on ground floor. repair damage of concrete slab and reinforce (e) wall at ground floorDetails
add family room, 1 office and bath on ground floor. repair damage of concrete slab and reinforce (e) wall at ground floor | $30,000 |
| Mar 13, 2018 | Completed final sign-off May 2022 | 1033 Sanchez St | remodel of a basement into an additional dwelling unit per ord 162-17: 2 bdrm, 2 bath 1485 sq ft habitable space. relocate (e) laundry & utility rm for bldg. 1-3 bicycle parking spaces.Details
remodel of a basement into an additional dwelling unit per ord 162-17: 2 bdrm, 2 bath 1485 sq ft habitable space. relocate (e) laundry & utility rm for bldg. 1-3 bicycle parking spaces. | $35,000 |
| Nov 21, 2017 | Completed final sign-off Mar 2021 | 1287 33rd Av | ground flr horizontal addition. add family rm & bath @ grnd flr. add toilet rm @ 2nd flr. add full bath @ 3rd flr. remodel (e) 2nd & 3rd flrs. (n) rear deck and stair.Details
ground flr horizontal addition. add family rm & bath @ grnd flr. add toilet rm @ 2nd flr. add full bath @ 3rd flr. remodel (e) 2nd & 3rd flrs. (n) rear deck and stair. | $70,000 |
| Dec 2, 2016 | Completed final sign-off Mar 2017 | 2347 19th Av | add 2 new bath 7 remodel one bathroom at 3rd floor (unit 2)Details
add 2 new bath 7 remodel one bathroom at 3rd floor (unit 2) | $30,000 |
| Sep 8, 2016 | Completed final sign-off Feb 2017 | 315 Bay St | revision to ref pa 201605046551 to omitting half bath and non load bearing wall in recption area. (e) ceiling and lighting to remain maher naDetails
revision to ref pa 201605046551 to omitting half bath and non load bearing wall in recption area. (e) ceiling and lighting to remain maher na | |
| May 4, 2016 | Completed final sign-off Feb 2017 | 315 Bay St | office build out, add three offices, conference rom, management office with private bathroom and open office area. n/a ordinance #155-13Details
office build out, add three offices, conference rom, management office with private bathroom and open office area. n/a ordinance #155-13 | $70,000 |
| Mar 1, 2016 | Completed final sign-off Apr 2017 | 147 Judson Av | develop basement accessory rooms - new rooms - bedroom, bathroom, office and bonus room.Details
develop basement accessory rooms - new rooms - bedroom, bathroom, office and bonus room. | $80,000 |
| Nov 24, 2015 | Completed final sign-off Aug 2016 | 430 Staples Av | convert ground floor to a bedroom with half bath, replace existing foundation by new footings, voluntary add shear wall & holdown.Details
convert ground floor to a bedroom with half bath, replace existing foundation by new footings, voluntary add shear wall & holdown. | $120,000 |
| Nov 2, 2015 | Completed final sign-off Jan 2016 | 315 Bay St | demolition of non-load bearing partition walls, renovated bathrooms, install kitchenette; maher n/aDetails
demolition of non-load bearing partition walls, renovated bathrooms, install kitchenette; maher n/a | $70,000 |
| Jul 24, 2015 | Completed final sign-off Feb 2017 | 442 Staples Av | legalize in-law unit per ordinance #43-14 lower slab remodel bath & kitchen with great room.Details
legalize in-law unit per ordinance #43-14 lower slab remodel bath & kitchen with great room. | $90,000 |
| Apr 23, 2015 | Completed final sign-off Sep 2015 | 2347 19th Av | convert e home theater to master bedroom, playroom exercise room and 2 new bath at gr fl. divided e family room to music and family room at 2nd fl, add new door at front of garageDetails
convert e home theater to master bedroom, playroom exercise room and 2 new bath at gr fl. divided e family room to music and family room at 2nd fl, add new door at front of garage | $55,000 |
| Jan 9, 2015 | Completed final sign-off Jun 2015 | 786 27th Av | 1. add exercise & home office two full bath at ground floor. 2. rearrange dining room, bedroom, kitchen on 2nd floor. 3. add (n) bathroom on 2nd floor and reaggrange (e) bathroom. 4. infill 2nd floor center patio.Details
1. add exercise & home office two full bath at ground floor. 2. rearrange dining room, bedroom, kitchen on 2nd floor. 3. add (n) bathroom on 2nd floor and reaggrange (e) bathroom. 4. infill 2nd floor center patio. | $90,000 |
| Jul 7, 2014 | Completed final sign-off Feb 2017 | 436 Staples Av | rooms down addition in garage- bed + bath, new stair b/w floors, new stair at rear, upgrade electrical serviceDetails
rooms down addition in garage- bed + bath, new stair b/w floors, new stair at rear, upgrade electrical service | $40,000 |
| Feb 6, 2012 | Completed final sign-off Oct 2012 | 315 Bay St | remove (e) non structural partitions, doors & kitchen cabinets. add new partitions, doors & window. new full bathroom & kitchenette. new carpet for future tenant space at 4th floor, approx 4020 sq ft. no stove. modification: relocate kitchenette, added bathroom & closets at penthouse.Details
remove (e) non structural partitions, doors & kitchen cabinets. add new partitions, doors & window. new full bathroom & kitchenette. new carpet for future tenant space at 4th floor, approx 4020 sq ft. no stove. modification: relocate kitchenette, added bathroom & closets at penthouse. | $21,000 |
| Dec 20, 2011 | Completed final sign-off Oct 2012 | 2357 Funston Av | 1)add guest room, laundry room,sitting room. family room. 2 storage, 2 full bathroom and one half bath on ground floor. 2) relocate extg washer dryer water heater, and furnace. 3)no work at 2nd floor.Details
1)add guest room, laundry room,sitting room. family room. 2 storage, 2 full bathroom and one half bath on ground floor. 2) relocate extg washer dryer water heater, and furnace. 3)no work at 2nd floor. | $40,000 |
| Jul 21, 2008 | Expired or cancelled cancelled Jan 2026 | 260 Kearny St | non structural interior wall repairs. electrical work at 3rd floor. install all new 5/8 drywall cceiling and wall. remodel old bathroom, upgrade to ada bathroomDetails
non structural interior wall repairs. electrical work at 3rd floor. install all new 5/8 drywall cceiling and wall. remodel old bathroom, upgrade to ada bathroom | $50,000 |
| Mar 1, 2005 | Never finaled issued Mar 2005, no final | 1278 Funston Av | relocate bathroom - water heater & furnace under 200409275195.Details
relocate bathroom - water heater & furnace under 200409275195. | |
| Oct 15, 2002 | Completed final sign-off Feb 2003 | 290 Juanita Wy | rev#200104257722. master bath rearing per plan. skylights (2) added (maxi faitor equal to 0.75) flooDetails
rev#200104257722. master bath rearing per plan. skylights (2) added (maxi faitor equal to 0.75) floo | $1,000 |
| Apr 9, 2002 | Completed final sign-off Aug 2002 | 1342 29th Av | add storage, office guest laudry room and 2 full bath on grd floor per plan.Details
add storage, office guest laudry room and 2 full bath on grd floor per plan. | $35,000 |
| Dec 24, 2001 | Completed final sign-off Mar 2002 | 2654 Anza St | replace bathroom windows (2) damaged by fireDetails
replace bathroom windows (2) damaged by fire | $2,000 |
| Sep 25, 2001 | Expired or cancelled expired Jan 2002 | 635 02nd Av | take out stove, modify bathroom to allow greater space for toilet (2')Details
take out stove, modify bathroom to allow greater space for toilet (2') | $1,500 |
| Sep 26, 2000 | Completed final sign-off Jan 2001 | 2205 34th Av | improve within 1st flrs ex envelope, bedrm, bath, study,famly rm with 1 car parkng & storge& util arDetails
improve within 1st flrs ex envelope, bedrm, bath, study,famly rm with 1 car parkng & storge& util ar | $20,000 |