Block 0288, lot 016
260 Kearny St
- City’s use
- Commercial Office
- Built
- 1908
- Stories
- 4
- Units
- 2
- Rooms
- 5 bathrooms
- Building
- 7,546 sq ft
- Lot
- 1,581 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 26, 2024 | Completed final sign-off Aug 2024 | 260 Kearny St | Z Construction Company Inc | g/f - mr. mahjung's bar new open review all existing. no new work. no constructionDetails
g/f - mr. mahjung's bar new open review all existing. no new work. no construction | |
| Jul 2, 2018 | Never finaled issued Jul 2018, no final | 260 Kearny St | street spaceDetails
street space | ||
| Mar 24, 2014 | Completed final sign-off Aug 2014 | 260 Kearny St | Lordan Construction | back bar refregeration units replacement in kind. ground floor storage room wall construction in basement. health department plan request. legalize food area in basement. replace (e) refrigerator units with 6'x7' walk in coolerDetails
back bar refregeration units replacement in kind. ground floor storage room wall construction in basement. health department plan request. legalize food area in basement. replace (e) refrigerator units with 6'x7' walk in cooler | $10,000 |
| Jun 29, 2010 | Completed final sign-off Sep 2010 | 260 Kearny St | adding ventless hood to the restaurant/cafe/bar, revision to application #201006164614. self-contained ansul system.Details
adding ventless hood to the restaurant/cafe/bar, revision to application #201006164614. self-contained ansul system. | ||
| Jun 16, 2010 | Completed final sign-off Sep 2010 | 260 Kearny St | Allied Teamwork Construction Co | interior seismic tenant improvement to existing restaurant inluding new kitchen/bar with modifications to existing mechanical, elec, plumbing systems. repair /replace health related finishes for sanitary compliance where needed. existing ten space and access to establishment is fully compliant adaDetails
interior seismic tenant improvement to existing restaurant inluding new kitchen/bar with modifications to existing mechanical, elec, plumbing systems. repair /replace health related finishes for sanitary compliance where needed. existing ten space and access to establishment is fully compliant ada | $20,000 |
| Aug 25, 2008 | Never finaled issued Aug 2008, no final | 260 Kearny St | 2nd floor - change of use of existing vacant acupressure office to acupuncture doctor's office.(acupuncture clinic). all h.c. access requirements were approved under p.a. #200412171718.Details
2nd floor - change of use of existing vacant acupressure office to acupuncture doctor's office.(acupuncture clinic). all h.c. access requirements were approved under p.a. #200412171718. | $2,000 | |
| Aug 5, 2008 | Completed final sign-off May 2009 | 260 Kearny St | Z Construction Company Inc | remodel (e) vacant offices at 3rd & 4th floors. remove some non-bearing walls, add handicap toilet, reinforce & check (e) floor structureDetails
remodel (e) vacant offices at 3rd & 4th floors. remove some non-bearing walls, add handicap toilet, reinforce & check (e) floor structure | $50,000 |
| Jul 21, 2008 | Expired or cancelled cancelled Jan 2026 | 260 Kearny St | Z Construction Company Inc | non structural interior wall repairs. electrical work at 3rd floor. install all new 5/8 drywall cceiling and wall. remodel old bathroom, upgrade to ada bathroomDetails
non structural interior wall repairs. electrical work at 3rd floor. install all new 5/8 drywall cceiling and wall. remodel old bathroom, upgrade to ada bathroom | $50,000 |
| Jun 12, 2008 | Never finaled issued Jun 2008, no final | 260 Kearny St | street space permit only.Details
street space permit only. | ||
| Feb 19, 2008 | Completed final sign-off May 2008 | 260 Kearny St | install non-load bearing 54" height partition. new accessibile front counter, relocate (e) food service eqt to new location at 260 kearny streetDetails
install non-load bearing 54" height partition. new accessibile front counter, relocate (e) food service eqt to new location at 260 kearny street | $40,000 | |
| Feb 14, 2008 | Expired or cancelled cancelled Jan 2026 | 260 Kearny St | hardwood floor and paint in ground floor officeDetails
hardwood floor and paint in ground floor office | $15,000 | |
| Dec 17, 2004 | Completed final sign-off Mar 2005 | 260 Kearny St | remodel (e) office into accupressure treatment office. restroom renovation.Details
remodel (e) office into accupressure treatment office. restroom renovation. | $46,100 | |
| Sep 16, 2003 | Completed final sign-off Aug 2004 | 260 Kearny St | seismic retrofit of unreinforced masonry bldg. as per special procedureDetails
seismic retrofit of unreinforced masonry bldg. as per special procedure | $90,000 | |
| Feb 12, 2003 | Never finaled issued Feb 2003, no final | 260 Kearny St | street spaceDetails
street space | ||
| Feb 22, 2002 | Never finaled issued May 2002, no final | 260 Kearny St | replace exist front doors & electrical key code security system w/ alum door. nov 200009810.Details
replace exist front doors & electrical key code security system w/ alum door. nov 200009810. | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Z Construction Company Inc (3), Allied Teamwork Construction Co, Lordan Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.