Back to kitchen remodel contractors
Yursta Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2008 to Jul 2022
- Last 24 months
- 0 permits filed
13 permits since 2000: 11 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 89 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2022 | Completed final sign-off May 2023 | 1440 Valencia St | kitchen and living room remodeling. install new cabients and appliances, firepalce (gas heater) relocation. one wall demolition. new skylight.Details
kitchen and living room remodeling. install new cabients and appliances, firepalce (gas heater) relocation. one wall demolition. new skylight. | $60,000 |
| Jun 23, 2017 | Completed final sign-off Aug 2017 | 414 28th St | kitchen cabinet installation, doors, 2 closets, washer dryer, dishwahser, sink, lights, subpanel upgradeDetails
kitchen cabinet installation, doors, 2 closets, washer dryer, dishwahser, sink, lights, subpanel upgrade | $14,000 |
| Mar 6, 2017 | Completed final sign-off Jun 2017 | 1438 Valencia St | removal of fire place seal at floor and ceiling. install 1 base kitchen cabinet, paintingDetails
removal of fire place seal at floor and ceiling. install 1 base kitchen cabinet, painting | $6,000 |
| May 30, 2008 | Completed final sign-off Jul 2008 | 70 Terra Vista Av | work @ unit# 12 only. to comply with nov# 200856055. remodel (e) kitchen, cabinets refacing, new countertop, new hardwood floor 100 sq. ft. new sink & faucet. new gfi electrical outlets. no structural work. no new lighting.Details
work @ unit# 12 only. to comply with nov# 200856055. remodel (e) kitchen, cabinets refacing, new countertop, new hardwood floor 100 sq. ft. new sink & faucet. new gfi electrical outlets. no structural work. no new lighting. | $8,171 |
| May 2, 2008 | Completed final sign-off Jul 2008 | 1385 Clay St | remodel unit # 24 on 4th floor, replace 5 windows (total 5), lighting, electrical, kitchen cabinets, bathroom upgrade, flooring.Details
remodel unit # 24 on 4th floor, replace 5 windows (total 5), lighting, electrical, kitchen cabinets, bathroom upgrade, flooring. | $45,000 |