Back to bathroom remodel contractors
Yuco Electrical
- Based in
- Concord
- On San Francisco permits
- Jul 2009 to Nov 2018
- Last 24 months
- 0 permits filed
15 permits since 2000: 9 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 5 completed, 3 never finaled. Typically 0 days from filing to permit and 615 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 12, 2018 | Completed final sign-off Jun 2020 | 590 Chestnut St | full remodeling of 2 bathrooms, kitchen, laundry, living, dining rooms and bedrooms. install/relocate new electircal panel to inside from outside. maher n/a.Details
full remodeling of 2 bathrooms, kitchen, laundry, living, dining rooms and bedrooms. install/relocate new electircal panel to inside from outside. maher n/a. | $20,000 |
| Jul 24, 2018 | Completed final sign-off Mar 2022 | 40 Alta St | limited demolition of interior walls, new bath and remodeled kitchen within a single dwelling unitDetails
limited demolition of interior walls, new bath and remodeled kitchen within a single dwelling unit | $20,000 |
| Jun 6, 2018 | Never finaled issued Jun 2018, no final | 572 Chestnut St | revision to 201804186692 add 2 bathroom remodel - new shower pan in each. replace sink and toilet. install fan and light maher naDetails
revision to 201804186692 add 2 bathroom remodel - new shower pan in each. replace sink and toilet. install fan and light maher na | $5,000 |
| Apr 18, 2018 | Never finaled issued Apr 2018, no final | 572 Chestnut St | to comply with nov# 201853202. kitchen remodeling, move sink & replace gas pipe install gfi in bathroom nw lights, & plugs, install sub panel in unitDetails
to comply with nov# 201853202. kitchen remodeling, move sink & replace gas pipe install gfi in bathroom nw lights, & plugs, install sub panel in unit | $16,472 |
| Jan 8, 2018 | Completed final sign-off Jun 2020 | 592 Chestnut St | within this unit remodel one kitchen & two bathrooms. install new electrical subpanel in unit, replace (e) light fixtures & piping. remove & replace air heating system. local wall opening & patch back at such locations only, no layout or opening change & walls changes, high efficacy lightings.Details
within this unit remodel one kitchen & two bathrooms. install new electrical subpanel in unit, replace (e) light fixtures & piping. remove & replace air heating system. local wall opening & patch back at such locations only, no layout or opening change & walls changes, high efficacy lightings. | $30,000 |
| Jan 3, 2018 | Never finaled issued Jan 2018, no final | 1228 Leavenworth St | each bathroom: retile; replace 9e) fixtures ad piping as need. rewire and new subpanel, new light fixtures and plug. change plumbing pipe, change fan in bathroom. no layout changes or wall mods. maher n/a.Details
each bathroom: retile; replace 9e) fixtures ad piping as need. rewire and new subpanel, new light fixtures and plug. change plumbing pipe, change fan in bathroom. no layout changes or wall mods. maher n/a. | $8,000 |
| Aug 9, 2011 | Completed final sign-off Oct 2011 | 2949 Harrison St | taking existing bathrooms, adding a toilet to one, adding a shower and sink to another.Details
taking existing bathrooms, adding a toilet to one, adding a shower and sink to another. | $18,000 |
| Aug 30, 2010 | Completed final sign-off Oct 2010 | 1617 Page St | remodel pantry room to shower bathroomDetails
remodel pantry room to shower bathroom | $15,000 |