Yong And Zhuo Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2017 to Aug 2026
- Last 24 months
- 18 permits filed
49 permits since 2000: 38 completed, 6 in progress, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
24 kitchen remodel permits: 18 completed, 4 in progress, 2 expired or cancelled. Typically 3 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2026 | In progress issued Jul 2026 | 1839 Cabrillo St | unit 1/ 2nd fl: convert e) bath into 2 baths, relocate e) kitchen, construct new bedroom, install new washer/dryer, relocate windows at rear facade. relocate window @ rear.Details
unit 1/ 2nd fl: convert e) bath into 2 baths, relocate e) kitchen, construct new bedroom, install new washer/dryer, relocate windows at rear facade. relocate window @ rear. | $26,000 |
| Jun 25, 2026 | In progress issued Jun 2026 | 255 Munich St | remodel (e) kitchen w/ new. convert 1 (e) bathroom to 2 full bath at 2/f. legalize (e) storage room to bedroom, media room, office, & construct 1 full bath, install wetbar at g/f.Details
remodel (e) kitchen w/ new. convert 1 (e) bathroom to 2 full bath at 2/f. legalize (e) storage room to bedroom, media room, office, & construct 1 full bath, install wetbar at g/f. | $268,000 |
| Apr 8, 2026 | In progress issued Apr 2026 | 1839 Cabrillo St | remodel kitchen and bathroom at 2nd floor. replace new insulation & sheet rock for living room and 2 bedroom with mineral woolDetails
remodel kitchen and bathroom at 2nd floor. replace new insulation & sheet rock for living room and 2 bedroom with mineral wool | $60,000 |
| Dec 31, 2025 | In progress issued Dec 2025 | 24 Rolph St | replace new tiles for kitchen floor, approx. 160 sq.ft.Details
replace new tiles for kitchen floor, approx. 160 sq.ft. | $3,000 |
| Dec 8, 2025 | Completed final sign-off Jul 2026 | 370 Naples St | remodel 1 full bathroom on 3/f. remodel kitchen on 2/f. replace new wires for electrical on 2/f and 3/f. upgrade 200 amp electric services. all in kind remodel. no removal of walls.Details
remodel 1 full bathroom on 3/f. remodel kitchen on 2/f. replace new wires for electrical on 2/f and 3/f. upgrade 200 amp electric services. all in kind remodel. no removal of walls. | $35,000 |
| Oct 2, 2025 | Completed final sign-off Aug 2026 | 375 Byxbee St | comply to nov #202430829 item #10. 1st floor: add two bedrooms, foyer, and two 3-fixture bathrooms, one kitchenettDetails
comply to nov #202430829 item #10. 1st floor: add two bedrooms, foyer, and two 3-fixture bathrooms, one kitchenett | $30,000 |
| Aug 14, 2025 | Completed final sign-off Mar 2026 | 1263 Holloway Av | remodel 2 full bathrooms and 1 kitchen. replace new sheetrock 5/8" for 3 bedrooms living room and dining room. install insulation for walls and ceiling.Details
remodel 2 full bathrooms and 1 kitchen. replace new sheetrock 5/8" for 3 bedrooms living room and dining room. install insulation for walls and ceiling. | $80,000 |
| Jun 30, 2025 | Completed final sign-off May 2026 | 323 Chicago Wy | remodel (e) kitchen, bathroom, add 1 full bath & replace (e) interior stair at 2/f. construct 1 bedroom, 1 ful bath, powder room, media room, & install wetbar at g/f.Details
remodel (e) kitchen, bathroom, add 1 full bath & replace (e) interior stair at 2/f. construct 1 bedroom, 1 ful bath, powder room, media room, & install wetbar at g/f. | $285,000 |
| Apr 22, 2025 | Completed final sign-off Sep 2025 | 2100 34th Av | comply nov 202532537. remodel kitchen, 1 full bathroom at 2nd fl. remodel 1 full bathroom at 1st fl. remodel 1 full bathroom at 3rd fl. replace whole house sheetrock and install new insulation for the whole house. replace new hardwood floor. replace new electrical wires for the whole house. (fire)Details
comply nov 202532537. remodel kitchen, 1 full bathroom at 2nd fl. remodel 1 full bathroom at 1st fl. remodel 1 full bathroom at 3rd fl. replace whole house sheetrock and install new insulation for the whole house. replace new hardwood floor. replace new electrical wires for the whole house. (fire) | $60,000 |
| Jan 2, 2025 | Completed final sign-off Sep 2025 | 650 Upland Dr | interior remodel of (e) 2 story single family residence. scope of work to include: ground floor: relocation of laundry room to (n) powder room and remodel of kitchen. 2nd/f remodel of (e) bath 2 and (e) bath 3, windows to be replaced in-kind.Details
interior remodel of (e) 2 story single family residence. scope of work to include: ground floor: relocation of laundry room to (n) powder room and remodel of kitchen. 2nd/f remodel of (e) bath 2 and (e) bath 3, windows to be replaced in-kind. | $60,000 |
| Dec 12, 2024 | Completed final sign-off Sep 2025 | 1270 31st Av | remodel kitchen and 1-bathroom @ 2/f. replace ne 5/8" sheetrock at living room, dining room and 2-bedrooms. repair the front stairway under 50%. no layout changes no moving walls.Details
remodel kitchen and 1-bathroom @ 2/f. replace ne 5/8" sheetrock at living room, dining room and 2-bedrooms. repair the front stairway under 50%. no layout changes no moving walls. | $45,000 |
| Oct 24, 2024 | Completed final sign-off Mar 2025 | 1030 Kirkham St | total of 5 bathrooms and 2 kitchens remodel in kind; in both units.Details
total of 5 bathrooms and 2 kitchens remodel in kind; in both units. | $50,000 |
| Jul 22, 2024 | Completed final sign-off Mar 2025 | 1210 48th Av | remodel (e) kitchen, convert one (e) bathroom to 2 full bathroom & replace (e) sheetrock w/ new at 2/f. costruct 1 bedroom, 1 full bath, media room, & laundry room at g/f.Details
remodel (e) kitchen, convert one (e) bathroom to 2 full bathroom & replace (e) sheetrock w/ new at 2/f. costruct 1 bedroom, 1 full bath, media room, & laundry room at g/f. | $232,000 |
| Jun 25, 2024 | Completed final sign-off Mar 2025 | 2082 Bancroft Av | 2/f: remodel kitchen per plans and bathroom. add new bathroom and relocated bedroom on 2/f. remodel living & dining room. no other work performed.Details
2/f: remodel kitchen per plans and bathroom. add new bathroom and relocated bedroom on 2/f. remodel living & dining room. no other work performed. | $101,000 |
| May 2, 2024 | Completed final sign-off Feb 2025 | 167 Somerset St | relocate (e) kitchen. remodel (e) bathroom, add 1 (n) bathroom & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 2 full bath, family room & install wetbar at g/f. construct (n) deck w/ staircase at rear of bldg (15'x8'x9'). replace 4 (e) window w/ new aluminum clad wood at front.Details
relocate (e) kitchen. remodel (e) bathroom, add 1 (n) bathroom & replace (e) sheetrock w/ new at 2/f. construct 2 bedroom, 2 full bath, family room & install wetbar at g/f. construct (n) deck w/ staircase at rear of bldg (15'x8'x9'). replace 4 (e) window w/ new aluminum clad wood at front. | $372,400 |
| Nov 15, 2023 | Completed final sign-off Jan 2025 | 1340 La Playa | rear bldg - remodel (e) kitchen: replace counter, cabinet, flooring & replace sheetrock w/ new. all work at g/f.Details
rear bldg - remodel (e) kitchen: replace counter, cabinet, flooring & replace sheetrock w/ new. all work at g/f. | $54,800 |
| Oct 26, 2023 | Completed final sign-off Aug 2024 | 937 Russia Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment. | $50,000 |
| Apr 21, 2022 | Completed final sign-off Dec 2023 | 2324 Cabrillo St | unit 2324 (3rd fl): reconfigure kitchen & bathroom layout. convert dining room to bedroom. remodel laundry room. new bathroom.Details
unit 2324 (3rd fl): reconfigure kitchen & bathroom layout. convert dining room to bedroom. remodel laundry room. new bathroom. | $24,000 |
| Mar 1, 2022 | Expired or cancelled cancelled Feb 2024 | 2326 Cabrillo St | remodel extg kitchen and bathroom. remove laths and plaster approx 600 sq ft replace with 5/8" type x sheet rock. at bathroom, bedroom and kitchen. no wall or layout changes.Details
remodel extg kitchen and bathroom. remove laths and plaster approx 600 sq ft replace with 5/8" type x sheet rock. at bathroom, bedroom and kitchen. no wall or layout changes. | $24,000 |
| Jul 16, 2020 | Expired or cancelled expired Aug 2024 | 331 Shields St | kitchen & two bathroom remodel. replace windows as in kind, same size & type,visible from street. window to be wood casemments new roof membrane (all work in-kind).no work to basement allowed per this permitDetails
kitchen & two bathroom remodel. replace windows as in kind, same size & type,visible from street. window to be wood casemments new roof membrane (all work in-kind).no work to basement allowed per this permit | $47,000 |
| Jan 23, 2020 | Completed final sign-off Jan 2021 | 44 Mount Vernon Av | renovate e kitchen & bathrm on 2/f; demolish e fireplace. reconfigure e 28" internal staircase to 36" & add a n 4'x4' skylight in the kitchen & renovate e 4th bedrm & n 5th bedrm on g/f. relocate e w/h & fau, w/a n 18" platform/strap ties. replace front widows w/wood clad & rear windows w/vinylDetails
renovate e kitchen & bathrm on 2/f; demolish e fireplace. reconfigure e 28" internal staircase to 36" & add a n 4'x4' skylight in the kitchen & renovate e 4th bedrm & n 5th bedrm on g/f. relocate e w/h & fau, w/a n 18" platform/strap ties. replace front widows w/wood clad & rear windows w/vinyl | $38,000 |
| Dec 19, 2019 | Completed final sign-off Mar 2020 | 372 Pope St | remodel 1 kitchen and 2 full bath at 2nd fl. upgrade electrical at 2nd fl. no structural workDetails
remodel 1 kitchen and 2 full bath at 2nd fl. upgrade electrical at 2nd fl. no structural work | $40,000 |
| Dec 6, 2019 | Completed final sign-off Jan 2021 | 23 Madrid St | remove lath and plaster at bedrooms, living, and dining room. remodel existing kitchen and bathroom in kindDetails
remove lath and plaster at bedrooms, living, and dining room. remodel existing kitchen and bathroom in kind | $10,000 |
| Sep 5, 2018 | Completed final sign-off May 2019 | 1822 33rd Av | remodel kitchen cabinets, tiles. replace two bathroom, new tiles, toilets and vanities at 2nd floor. upgrade 200 amp new electrical services.Details
remodel kitchen cabinets, tiles. replace two bathroom, new tiles, toilets and vanities at 2nd floor. upgrade 200 amp new electrical services. | $15,000 |