Back to kitchen remodel contractors
Yl General Construction
- Based in
- San Pablo
- On San Francisco permits
- Sep 2019 to Jun 2026
- Last 24 months
- 7 permits filed
14 permits since 2000: 12 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2026 | Completed final sign-off Jun 2026 | 466 34th Av | kitchen remodel like for like, update electrical with sub panel, update plumbing, replace 4 windows non street facing with vinyl material.Details
kitchen remodel like for like, update electrical with sub panel, update plumbing, replace 4 windows non street facing with vinyl material. | $50,000 |
| Mar 25, 2025 | Completed final sign-off Jul 2025 | 1507 30th Av | revision to pa#202502240928. 1st floor: relocate laundry, add new media with wet bar. den and 1 full bath. 2nd floor: reconfigure kitchen and existing bathroom. add new pantry and powder room.Details
revision to pa#202502240928. 1st floor: relocate laundry, add new media with wet bar. den and 1 full bath. 2nd floor: reconfigure kitchen and existing bathroom. add new pantry and powder room. | $135,000 |
| Feb 24, 2025 | Completed final sign-off Jul 2025 | 1507 30th Av | kitchen and bath remodeol with upgraded electrical 200 amp panelDetails
kitchen and bath remodeol with upgraded electrical 200 amp panel | $45,000 |
| May 21, 2021 | Completed final sign-off Jan 2022 | 274 Jules Av | 1 kitchen remodel in-kind. non-structural. subpanel. new electrical wiring.Details
1 kitchen remodel in-kind. non-structural. subpanel. new electrical wiring. | $9,000 |
| Dec 27, 2019 | Completed final sign-off Jun 2020 | 260 South Hill Bl | remodel kitchen, bahtroom and 1/2 bathroom. replace old sheetrock, old plumbing pipe and electrical panel.Details
remodel kitchen, bahtroom and 1/2 bathroom. replace old sheetrock, old plumbing pipe and electrical panel. | $50,000 |