Back to kitchen remodel contractors
Yes Construction Group Inc
- Based in
- Oakland
- On San Francisco permits
- Nov 2007 to Oct 2026
- Last 24 months
- 3 permits filed
8 permits since 2000: 6 completed, 1 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 85 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2025 | Completed final sign-off Nov 2025 | 586 Cambridge St | reference to complaint 202540512. add kitchenette at 1st fl per planDetails
reference to complaint 202540512. add kitchenette at 1st fl per plan | $15,000 |
| Jan 20, 2010 | Completed final sign-off Mar 2010 | 221 Foerster St | install handrails, correct electrical violation, remove dry-rotten landing near kitchen, repair damaged walls. to comply with his/nov#200926536 dated; 12/4/2009.Details
install handrails, correct electrical violation, remove dry-rotten landing near kitchen, repair damaged walls. to comply with his/nov#200926536 dated; 12/4/2009. | $3,000 |
| Nov 7, 2007 | Completed final sign-off Jul 2008 | 1655 Chestnut St | bathroom: tile wall replacement , tub, toilet. floor: replacement to hardwood. kitchen: replacement of the cabinet & counter top. no structural.Details
bathroom: tile wall replacement , tub, toilet. floor: replacement to hardwood. kitchen: replacement of the cabinet & counter top. no structural. | $12,000 |