Yefa Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2017 to Jun 2026
- Last 24 months
- 24 permits filed
92 permits since 2000: 73 completed, 16 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
19 stairs permits: 10 completed, 8 in progress, 1 never finaled. Typically 68 days from filing to permit and 236 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2026 | In progress filed Jun 2026, not yet issued | 224 29th St | rev 202503071835: remove hatch to roof -create open exterior stair for roof hatch access.adjust roof deck footprint.adjust building footprint on w/s to align with adjacent lightwell (no increase to areas). adjust unit layouts.adjust side and rear facing wdws. expand elevator to be common and 3 lvls.Details
rev 202503071835: remove hatch to roof -create open exterior stair for roof hatch access.adjust roof deck footprint.adjust building footprint on w/s to align with adjacent lightwell (no increase to areas). adjust unit layouts.adjust side and rear facing wdws. expand elevator to be common and 3 lvls. | |
| May 5, 2026 | Completed final sign-off May 2026 | 862 York St | revision to bpa# 202505136374 & 202511038749: change interior stairs railing from metal to glass.Details
revision to bpa# 202505136374 & 202511038749: change interior stairs railing from metal to glass. | |
| Jan 20, 2026 | In progress issued Jan 2026 | 9 Juri St | revision to pa # 2024-0409-9652: revise structural plans to reflect work. correct scope of work to " rebuild exterior stairs and replace windows at rear of front building. exploratory demo for dry rotDetails
revision to pa # 2024-0409-9652: revise structural plans to reflect work. correct scope of work to " rebuild exterior stairs and replace windows at rear of front building. exploratory demo for dry rot | |
| Jan 13, 2026 | In progress issued Jan 2026 | 1642 Church St | remove existing rear yard facing access stair. provide new guards at rear facing doors.Details
remove existing rear yard facing access stair. provide new guards at rear facing doors. | $18,000 |
| Jan 13, 2026 | In progress issued Jan 2026 | 208 Valley St | remove landing access existing stair. stair removed under seperate permit. infill door at kitchen not visible from street.Details
remove landing access existing stair. stair removed under seperate permit. infill door at kitchen not visible from street. | $8,000 |
| Nov 25, 2025 | Completed final sign-off Jul 2026 | 883 De Haro St | revision bpa# 202403147816. 1/f: reconfigure 2 bedroom's layout. 2/f: reconfigure kitchen layout. 3/f: reconfigure bathroom layout. add new stairs at rear.Details
revision bpa# 202403147816. 1/f: reconfigure 2 bedroom's layout. 2/f: reconfigure kitchen layout. 3/f: reconfigure bathroom layout. add new stairs at rear. | $8,000 |
| Nov 3, 2025 | Completed final sign-off Apr 2026 | 862 York St | revision to pa# 2025-0513-6374. 1st fl: reconfigure layout, remove 1 bedroom, add 1 family room and wet bar. 2nd fl: reconfiguration per plan. reduce scope of work. new skylights. relocate interiors stair.Details
revision to pa# 2025-0513-6374. 1st fl: reconfigure layout, remove 1 bedroom, add 1 family room and wet bar. 2nd fl: reconfiguration per plan. reduce scope of work. new skylights. relocate interiors stair. | $8,000 |
| Dec 6, 2024 | In progress issued Sep 2025 | 120 Shakespeare St | to comply with nov #201478001 and 2019511681. demolishing the extg exterior structural and bldg a new 2 story exterior stair and deck. adu at ground levelDetails
to comply with nov #201478001 and 2019511681. demolishing the extg exterior structural and bldg a new 2 story exterior stair and deck. adu at ground level | $50,000 |
| Apr 9, 2024 | In progress issued Sep 2025 | 9 Juri St | front bldg: rebuild exterior stairs at rear. re-frame rear portion of front bldg. new window at rear.Details
front bldg: rebuild exterior stairs at rear. re-frame rear portion of front bldg. new window at rear. | $20,000 |
| Mar 19, 2024 | Completed final sign-off Dec 2024 | 41 Brunswick St | replace foundation and new stairs on grade at rear. replace 1st floor front window with alum. clad wood (fx), and new door.Details
replace foundation and new stairs on grade at rear. replace 1st floor front window with alum. clad wood (fx), and new door. | $60,000 |
| Oct 25, 2023 | Completed final sign-off Oct 2024 | 21 Massasoit St | (n) opening between bedrm & living rm. (n) opening between hall & living rm. new kitchen w/ fixtures/finishes. (n) exterior stair @ rear.Details
(n) opening between bedrm & living rm. (n) opening between hall & living rm. new kitchen w/ fixtures/finishes. (n) exterior stair @ rear. | $30,000 |
| Feb 10, 2023 | Completed final sign-off Dec 2023 | 533 Peralta Av | revision to pa# 2022-0927-3266; switch location of bathroom/washer and dryer replace stair landing (interior)Details
revision to pa# 2022-0927-3266; switch location of bathroom/washer and dryer replace stair landing (interior) | |
| Jan 23, 2023 | Completed final sign-off Aug 2023 | 2660 Filbert St | remodel (1) kitchen, (1) bath, add (1) new 1/2 bath + (1) new full bath, remodel (1) 1/2 bath to full bath. replace vanity @ (e) bath (3rd/f), replace water heater, reconfig ducts from furnace, new closet + reconfig stair landing @ 2/f foyer, open wall between kitchen + dining, cover int side of (1)Details
remodel (1) kitchen, (1) bath, add (1) new 1/2 bath + (1) new full bath, remodel (1) 1/2 bath to full bath. replace vanity @ (e) bath (3rd/f), replace water heater, reconfig ducts from furnace, new closet + reconfig stair landing @ 2/f foyer, open wall between kitchen + dining, cover int side of (1) | $125,000 |
| Dec 28, 2022 | In progress issued Apr 2025 | 2919 Webster St | attic conversion with (n) dormers,(n) horizontal addition & roof deck at attic level. access stair at rear. ground level remodel at (e) garage and back storage space conversion to living space.Details
attic conversion with (n) dormers,(n) horizontal addition & roof deck at attic level. access stair at rear. ground level remodel at (e) garage and back storage space conversion to living space. | $225,800 |
| Sep 23, 2021 | In progress issued Oct 2023 | 269 Stratford Dr | new addition above the existing kitchen and dining room areas. new addition to provide one bedroom, full bathroom, and new stairs to access the addition from the existing hallway.Details
new addition above the existing kitchen and dining room areas. new addition to provide one bedroom, full bathroom, and new stairs to access the addition from the existing hallway. | $105,000 |
| May 21, 2021 | Completed final sign-off Aug 2023 | 190 Putnam St | 1st fl. add bedroom and 1 full bath 2nd fl. total kitchen and bathroom remodel, reconfigure interior stairsDetails
1st fl. add bedroom and 1 full bath 2nd fl. total kitchen and bathroom remodel, reconfigure interior stairs | $85,000 |
| Oct 26, 2020 | Never finaled issued Dec 2022, no final | 888 Folsom St | t.i. of (e) g/f: new child care facility. new ada restrooms, (n) exterior ramp & stair w/ level landing @ entry & (n) classrooms & finishes & lighting throughout.Details
t.i. of (e) g/f: new child care facility. new ada restrooms, (n) exterior ramp & stair w/ level landing @ entry & (n) classrooms & finishes & lighting throughout. | $380,000 |
| Aug 12, 2020 | Completed final sign-off Jan 2025 | 1779 15th St | vertical addition to existing 3 unit building. add fourth floor for new bedroom level connected to 3rd floor unit- remodel 3rd floor unit for total 5 bedroom 3 1/2 bath unit. remodel first and second floor units. replace existing rear non-conforming egress stair.document/verify 3rd unit on ground flDetails
vertical addition to existing 3 unit building. add fourth floor for new bedroom level connected to 3rd floor unit- remodel 3rd floor unit for total 5 bedroom 3 1/2 bath unit. remodel first and second floor units. replace existing rear non-conforming egress stair.document/verify 3rd unit on ground fl | $275,000 |
| Aug 21, 2018 | Completed final sign-off Feb 2023 | 300 Somerset St | comply w/ complaint# 201876752. unit legalization per ord 43-14, legalize unit installed w/o permit. legalize kitchen. all work @ ground flr. add staircase @ rear of bldg.Details
comply w/ complaint# 201876752. unit legalization per ord 43-14, legalize unit installed w/o permit. legalize kitchen. all work @ ground flr. add staircase @ rear of bldg. | $15,000 |