Yazy Construction
- Based in
- San Anselmo
- On San Francisco permits
- Feb 2007 to Aug 2010
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 never finaled. Typically 212 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 21, 2008 | Never finaled issued Nov 2008, no final | 2735 Golden Gate Av | 3 foot vertical addition at rear portion of house. enlarge previous 3rd story addition to include new bathroom. interior renovation consist of relocating existing bathroom and staircase. no work at lower level unit. fire damage repaired under sep permit. comp 200787819-bid.Details
3 foot vertical addition at rear portion of house. enlarge previous 3rd story addition to include new bathroom. interior renovation consist of relocating existing bathroom and staircase. no work at lower level unit. fire damage repaired under sep permit. comp 200787819-bid. | $100,000 |