Back to kitchen remodel contractors
Y W Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Sep 2026
- Last 24 months
- 13 permits filed
61 permits since 2000: 49 completed, 7 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
28 kitchen remodel permits: 22 completed, 4 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 8, 2026 | In progress filed Sep 2026, not yet issued | 1231 04th Av | remodel of 3 existing bathrooms, construction and alteration of interior partition at garage level, new structural seismic upgrades at garage level, new wall opening between kitchen and dining in both dwellings, enlargement of exericise room, window, and door replacement throughout.Details
remodel of 3 existing bathrooms, construction and alteration of interior partition at garage level, new structural seismic upgrades at garage level, new wall opening between kitchen and dining in both dwellings, enlargement of exericise room, window, and door replacement throughout. | $400,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 434 10th Av | upper unit #434: kitchen remodel, existing half bath remodel, and convert closet into half bath. no exterior change.Details
upper unit #434: kitchen remodel, existing half bath remodel, and convert closet into half bath. no exterior change. | $40,000 |
| Mar 12, 2026 | Completed final sign-off Jun 2026 | 806 Hayes St | unit 2: in kind remodel of 1 kitchen and 1 bathroom on the 3rd fl. no change to floor layout. no change to wall layout. no structural work. maintain all existing fire rating.Details
unit 2: in kind remodel of 1 kitchen and 1 bathroom on the 3rd fl. no change to floor layout. no change to wall layout. no structural work. maintain all existing fire rating. | $30,000 |
| Feb 20, 2026 | Expired or cancelled cancelled Mar 2026 | 806 Hayes St | in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 1 bathroom(s) in 3rd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 3rd fl and in-kind remodeling of 1 bathroom(s) in 3rd fl with 0 shower pan(s). | $20,000 |
| Feb 20, 2026 | Completed final sign-off Jul 2026 | 3660 22nd St | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $20,000 |
| Aug 20, 2025 | In progress issued Aug 2025 | 62 Newburg St | remodel existing kitchen at 2nd floor. upgrade existing knob and tube wiring. patch and replace sheetrock.Details
remodel existing kitchen at 2nd floor. upgrade existing knob and tube wiring. patch and replace sheetrock. | $40,000 |
| Jun 26, 2025 | Completed final sign-off Jan 2026 | 140 Cedro Av | remodel kitchen and pantry, prmary bathroom, hall bath, powder room. in kind.Details
remodel kitchen and pantry, prmary bathroom, hall bath, powder room. in kind. | $75,000 |
| Oct 11, 2024 | Completed final sign-off Jan 2025 | 2355 Pacific Av | kitchen remodel in kindDetails
kitchen remodel in kind | $30,000 |
| Feb 22, 2024 | Completed final sign-off Aug 2024 | 1710 36th Av | remodel kitchen: (n) appliances and cabinets. remodel bath at second floor: (n) fixtures locations. widen openings between living room and dining room. remove fireplace at living room. replace skylight at kitchen. restore landscaping and permeable surfaces within the front setback per google photo.Details
remodel kitchen: (n) appliances and cabinets. remodel bath at second floor: (n) fixtures locations. widen openings between living room and dining room. remove fireplace at living room. replace skylight at kitchen. restore landscaping and permeable surfaces within the front setback per google photo. | $70,000 |
| Oct 23, 2023 | Completed final sign-off Apr 2024 | 5061 Mission St | unit #5063: i kitchen and 1 bathroom remodel. all work upstairs unit.Details
unit #5063: i kitchen and 1 bathroom remodel. all work upstairs unit. | $30,000 |
| Oct 17, 2023 | Completed final sign-off Jul 2024 | 563 Wisconsin St | convert (e) 1st floor storage space into (1) office, (1) famiy room and (1) full bath. remodel 2nd floor (2) bathrooms and (1) kitchen. relocate washer and dryer, furnace, water heater (n).Details
convert (e) 1st floor storage space into (1) office, (1) famiy room and (1) full bath. remodel 2nd floor (2) bathrooms and (1) kitchen. relocate washer and dryer, furnace, water heater (n). | $50,000 |
| May 23, 2023 | Completed final sign-off Aug 2023 | 4317 21st St | unit 1: kitchen cabinets and countertop replacement. no other work. reuse existing appliances and fixtures.Details
unit 1: kitchen cabinets and countertop replacement. no other work. reuse existing appliances and fixtures. | $10,000 |
| Apr 6, 2023 | Completed final sign-off Oct 2023 | 1435 12th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 3 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 3 shower pan(s). | $50,000 |
| Jan 9, 2023 | Completed final sign-off Apr 2023 | 425 04th Av | unit #427: (1) bathroom and (1) kitchen remodel in kind.Details
unit #427: (1) bathroom and (1) kitchen remodel in kind. | $28,000 |
| Aug 8, 2022 | Completed final sign-off Jan 2023 | 875 37th Av | remodel (2) kitchens and (2) bathrooms in kind non structural. (1 kitchen and 1 bath in each unit)Details
remodel (2) kitchens and (2) bathrooms in kind non structural. (1 kitchen and 1 bath in each unit) | $50,000 |
| Feb 18, 2022 | Completed final sign-off May 2022 | 748 09th Av | remodel (e) kitchen, in-kind.Details
remodel (e) kitchen, in-kind. | $24,000 |
| Dec 17, 2021 | Expired or cancelled cancelled Jan 2026 | 746 09th Av | kitchen remodel inkind. admin permit to remove "a" from address. no change in scope of work. pa #202110180607Details
kitchen remodel inkind. admin permit to remove "a" from address. no change in scope of work. pa #202110180607 | |
| Nov 1, 2021 | Completed final sign-off Dec 2021 | 10 Castillo St | remodel one (e) kitchen & one bathroom. no relocation. non structural.Details
remodel one (e) kitchen & one bathroom. no relocation. non structural. | $30,000 |
| Oct 18, 2021 | Completed final sign-off May 2022 | 746 09th Av | unit a: kitchen remodel in-kind no structural work-no framing modificationDetails
unit a: kitchen remodel in-kind no structural work-no framing modification | $13,000 |
| Sep 27, 2021 | Completed final sign-off Apr 2022 | 2580 Diamond St | remodel 1 kitchen and i bath in kind @ 1st fl. lights per cenc 150.0(k).Details
remodel 1 kitchen and i bath in kind @ 1st fl. lights per cenc 150.0(k). | $30,000 |
| Sep 8, 2021 | Completed final sign-off Dec 2021 | 1685 Cayuga Av | non structural remodel (1) kitchen & (1) bathroom in kind, install new subpanel, upgrade (e) knob & tube wirning. h.e. lighting & per cec 150.0(k)Details
non structural remodel (1) kitchen & (1) bathroom in kind, install new subpanel, upgrade (e) knob & tube wirning. h.e. lighting & per cec 150.0(k) | $20,000 |
| Jun 8, 2021 | Completed final sign-off Mar 2022 | 62 University St | remodel one existing kitchen and 1 bathroomm. no relocation. non structural.Details
remodel one existing kitchen and 1 bathroomm. no relocation. non structural. | $30,000 |
| Apr 2, 2021 | Completed final sign-off Sep 2021 | 1263 12th Av | unit a:kitchen remodel in-kind. to comply with cec 150.0(k)3.Details
unit a:kitchen remodel in-kind. to comply with cec 150.0(k)3. | $12,000 |
| Jul 10, 2020 | Completed final sign-off Sep 2022 | 222 Molimo Dr | renovation of (e) sfd. 1/f: adding family room, bathroom and laundry (297 sq ft). 2/f: relocate (e) living, dining & kitchen to 3/f, add master bedroom and master bathroom. 3/f: relocate (e) bedroom & bathroom to 2/f. relocate (e) interior stairway between 2/f and 3/f. add powder room and stairwayDetails
renovation of (e) sfd. 1/f: adding family room, bathroom and laundry (297 sq ft). 2/f: relocate (e) living, dining & kitchen to 3/f, add master bedroom and master bathroom. 3/f: relocate (e) bedroom & bathroom to 2/f. relocate (e) interior stairway between 2/f and 3/f. add powder room and stairway | $120,000 |
| Oct 9, 2019 | Completed final sign-off Jun 2020 | 1011 23rd St | unit 18: remodel (e) kitchen & bathroom. replace kitchen cabinets & counter, no relocation like for like. replace bathroom tub/tile/vanity/water closet, no relocation, like for like.Details
unit 18: remodel (e) kitchen & bathroom. replace kitchen cabinets & counter, no relocation like for like. replace bathroom tub/tile/vanity/water closet, no relocation, like for like. | $20,000 |
| Mar 15, 2018 | Completed final sign-off Nov 2018 | 946 Stockton St | unit 11a: remodel kitchen & hallway bathroomDetails
unit 11a: remodel kitchen & hallway bathroom | $10,000 |
| May 27, 2016 | Completed final sign-off Jul 2020 | 521 Los Palmos Dr | vertical addition. remodel & replace existing sunroom. remodel kitchen. add upper rear master suite bedroom & bathroom penthouse vertically. no changes to existing front nor lower floors.Details
vertical addition. remodel & replace existing sunroom. remodel kitchen. add upper rear master suite bedroom & bathroom penthouse vertically. no changes to existing front nor lower floors. | $100,000 |
| Jun 17, 2015 | In progress issued Nov 2024 | 56 Newburg St | add 3rd fl to (e) bldg. horizontal extention to rear on ground, 2nd & 3rd fl. remodel 2nd fl. 3rd fl: (n) kitchen, bathroom, living room & dining room.Details
add 3rd fl to (e) bldg. horizontal extention to rear on ground, 2nd & 3rd fl. remodel 2nd fl. 3rd fl: (n) kitchen, bathroom, living room & dining room. | $120,000 |