Back to kitchen remodel contractors
Y R C Construction
- Based in
- Daly City
- On San Francisco permits
- Jun 2011 to Feb 2026
- Last 24 months
- 4 permits filed
22 permits since 2000: 17 completed, 2 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 4 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2025 | Completed final sign-off Dec 2025 | 108 Waverly Pl | unit #2: interior remodel at 2nd flr: upgrade the (e) bathroom with new fixtures, add one new toilet, remodel kitchen with new fixtures. replace flooring and new paint to the interior of the 2nd flr.Details
unit #2: interior remodel at 2nd flr: upgrade the (e) bathroom with new fixtures, add one new toilet, remodel kitchen with new fixtures. replace flooring and new paint to the interior of the 2nd flr. | $45,000 |
| Apr 18, 2019 | Completed final sign-off Nov 2019 | 4101 23rd St | kitchen and bathroom remodel including upgrade of electrical & plumbing, replacing dishwasher, disposal, microwave hood, gas range, replacing gas furnace & ducting. upgrade laundry supply & sewer adding electrical subpanel to floor of occupancy. upgrading all plugs, switches and light fixtures.Details
kitchen and bathroom remodel including upgrade of electrical & plumbing, replacing dishwasher, disposal, microwave hood, gas range, replacing gas furnace & ducting. upgrade laundry supply & sewer adding electrical subpanel to floor of occupancy. upgrading all plugs, switches and light fixtures. | $75,000 |
| Jan 3, 2019 | Completed final sign-off Feb 2020 | 2251 43rd Av | 1. remodel a full bathroom & kitchen at the second floor. 2. replace the front windows. 3. remodel the full bathroom in basement.Details
1. remodel a full bathroom & kitchen at the second floor. 2. replace the front windows. 3. remodel the full bathroom in basement. | $50,000 |
| Jun 12, 2017 | Completed final sign-off Nov 2019 | 2539 42nd Av | 1st flr: new bathroom, bedroom; infill area under (e) bedroom for new family room, new wood patio. 2nd flr: remodel (e) bathroom, kitchen and bedrooms. remodel/add shower to (e) half bathDetails
1st flr: new bathroom, bedroom; infill area under (e) bedroom for new family room, new wood patio. 2nd flr: remodel (e) bathroom, kitchen and bedrooms. remodel/add shower to (e) half bath | $49,000 |
| Jan 29, 2016 | Never finaled issued Feb 2016, no final | 2367 39th Av | revision under pa 201510301216; enlarged one bedrm at ground floor, remodel (e) kitchen, one bath rm & add one new bath rm at 2nd flr.Details
revision under pa 201510301216; enlarged one bedrm at ground floor, remodel (e) kitchen, one bath rm & add one new bath rm at 2nd flr. | $25,000 |
| Apr 1, 2013 | Completed final sign-off May 2013 | 1817 California St | replace all kitchen cabinets, tiles the kitchen floor. add 4 flourscent lightd in kitchen ceiling. add 8 recessed lights in living room ceiling. all recessed lights shall be fire ratedDetails
replace all kitchen cabinets, tiles the kitchen floor. add 4 flourscent lightd in kitchen ceiling. add 8 recessed lights in living room ceiling. all recessed lights shall be fire rated | $10,000 |
| Jun 20, 2011 | Completed final sign-off Aug 2011 | 483 Gold Mine Dr | remodel kitchen.Details
remodel kitchen. | $5,000 |