Y L Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2021 to Sep 2026
- Last 24 months
- 9 permits filed
15 permits since 2000: 13 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 1 in progress, 1 expired or cancelled. Typically 10 days from filing to permit and 742 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 20, 2026 | In progress filed Jan 2026, not yet issued | 39 Lakewood Av | revision to pa #202508072495. staircase is originally brick, but want to change material to stone.Details
revision to pa #202508072495. staircase is originally brick, but want to change material to stone. | $4,000 |
| Aug 7, 2025 | Expired or cancelled expired Sep 2026 | 39 Lakewood Av | revision to pa #202503212743. construct retaining wall along north property line. change proposed window in ground floor office to sliding door. add door in garage leading to side yard. perform dryrot repair at front stairs framing, not exceed 50%.Details
revision to pa #202503212743. construct retaining wall along north property line. change proposed window in ground floor office to sliding door. add door in garage leading to side yard. perform dryrot repair at front stairs framing, not exceed 50%. | $45,000 |
| Mar 21, 2025 | Completed final sign-off Sep 2026 | 39 Lakewood Av | comply w/ nov#'s 201033125,202180829,202182141,202182397,202182462: dry rot repair thru house. replace stucco finish all exterior walls. replace all windows w/double pane(st faacing windows aluminum clad wood) 2nd/fl: create open floor plan for living, dining & kitchen, recofigure interior stairsDetails
comply w/ nov#'s 201033125,202180829,202182141,202182397,202182462: dry rot repair thru house. replace stucco finish all exterior walls. replace all windows w/double pane(st faacing windows aluminum clad wood) 2nd/fl: create open floor plan for living, dining & kitchen, recofigure interior stairs | $230,000 |
| Jul 21, 2023 | Completed final sign-off Aug 2025 | 2135 34th Av | 2nd fl. infill center patio to create fl. plan for living room dining room and kitchen, recongigure interior stairs, convert bedroom to master bath and closet relocate full bath dd office, add exterior stairs to back yard, groud fl. relocate family room and master bedroom/bath, add bedroom, fitnessDetails
2nd fl. infill center patio to create fl. plan for living room dining room and kitchen, recongigure interior stairs, convert bedroom to master bath and closet relocate full bath dd office, add exterior stairs to back yard, groud fl. relocate family room and master bedroom/bath, add bedroom, fitness | $200,000 |
| Jul 14, 2023 | Completed final sign-off Aug 2025 | 21 Baltimore Wy | 2nd fl. convert kitchen and nook to master bedroom and bath, convert dining room to combined kitchen/dining reconfigure and remodel full bath, relocate interior stairs. ground fl. add family room with kitchenette, entertainment room, excercise room, bedroom (2) full bathrs, and 1/4 bath. replaceDetails
2nd fl. convert kitchen and nook to master bedroom and bath, convert dining room to combined kitchen/dining reconfigure and remodel full bath, relocate interior stairs. ground fl. add family room with kitchenette, entertainment room, excercise room, bedroom (2) full bathrs, and 1/4 bath. replace | $200,000 |