Back to kitchen remodel contractors
Y C Plumbing Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to Jun 2008
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 211 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2008 | Completed final sign-off Jan 2009 | 1962 18th Av | 2nd floor: remodel e kitchen and bathroom, infill e lightwell,convert e dining rm into bedroom, add bath. ground floor: 2 new bedrooms, 1 toilet room, 1 storage room at gr fl per plan, remove e stair (interior)to 2nd fl, replace e beam, post and footing, slab per plan at ground floorDetails
2nd floor: remodel e kitchen and bathroom, infill e lightwell,convert e dining rm into bedroom, add bath. ground floor: 2 new bedrooms, 1 toilet room, 1 storage room at gr fl per plan, remove e stair (interior)to 2nd fl, replace e beam, post and footing, slab per plan at ground floor | $75,000 |