Back to kitchen remodel contractors
Xp Construction Llc.
- Based in
- El Dorado Hills
- On San Francisco permits
- Jan 2025 to Jul 2026
- Last 24 months
- 8 permits filed
8 permits since 2000: 3 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 in progress. Typically 106 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2026 | In progress issued Jun 2026 | 1716 Baker St | replace door system at rear, kitchen wall with cabana doors upgrade shear.Details
replace door system at rear, kitchen wall with cabana doors upgrade shear. | $32,000 |
| Jan 9, 2025 | In progress issued Jul 2025 | 1716 Baker St | remodel (e) kitchen and 2.5 bathrooms. add (2) bathrooms at 2/f. remodel kitchenette/wet bar and a voluntary seismic upgrade.Details
remodel (e) kitchen and 2.5 bathrooms. add (2) bathrooms at 2/f. remodel kitchenette/wet bar and a voluntary seismic upgrade. | $200,000 |