Back to kitchen remodel contractors
X O Builders
- Based in
- San Francisco
- On San Francisco permits
- May 2006 to Dec 2025
- Last 24 months
- 2 permits filed
53 permits since 2000: 41 completed, 2 in progress, 3 never finaled, 7 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 12 completed, 1 in progress. Typically 0 days from filing to permit and 315 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2025 | In progress issued Feb 2026 | 330 Eureka St | lower unit: create wider opening btw dining and living room, remove interior doors & add a new closet & a new full bathroom, add a water heater, install fixture in e) bath & kitchenDetails
lower unit: create wider opening btw dining and living room, remove interior doors & add a new closet & a new full bathroom, add a water heater, install fixture in e) bath & kitchen | $50,000 |
| Aug 20, 2024 | Completed final sign-off Oct 2025 | 2126 41st Av | remodel existing kitchen and bathroom on the 2nd flr. remove load bearing wall in the kitchen and add new posts and beam. replace partition walls with guardrails at stairsDetails
remodel existing kitchen and bathroom on the 2nd flr. remove load bearing wall in the kitchen and add new posts and beam. replace partition walls with guardrails at stairs | $75,000 |
| Feb 21, 2023 | Completed final sign-off Aug 2023 | 1973 23rd Av | kitchen remodel in kind. new sub-panel.Details
kitchen remodel in kind. new sub-panel. | $30,000 |
| Apr 22, 2021 | Completed final sign-off Feb 2024 | 89 Forest Knolls Dr | remodel 1st level: one new bath, one new bedroom. remodel 2nd level: reconfigure one bath and kitchen. voluntary seismic retrofit first level: structural engineer and 492 sq ft plus of conditioned space.Details
remodel 1st level: one new bath, one new bedroom. remodel 2nd level: reconfigure one bath and kitchen. voluntary seismic retrofit first level: structural engineer and 492 sq ft plus of conditioned space. | $200,000 |
| Sep 28, 2020 | Completed final sign-off Mar 2022 | 1841 23rd Av | remodeling kitchen and bathroom at 2nd fl in-kind. no structural work.Details
remodeling kitchen and bathroom at 2nd fl in-kind. no structural work. | $10,000 |
| Feb 28, 2019 | Completed final sign-off Nov 2019 | 627 Shields St | remodel kitchen, and remove partial wallDetails
remodel kitchen, and remove partial wall | $15,000 |
| Nov 19, 2018 | Completed final sign-off Jun 2019 | 1966 23rd Av | remodel bathroom and kitchenDetails
remodel bathroom and kitchen | $15,000 |
| Feb 21, 2018 | Completed final sign-off Mar 2019 | 354 Arkansas St | this project is a kitchen and one bath remodel. no change in wall and opening and layout; n/a maherDetails
this project is a kitchen and one bath remodel. no change in wall and opening and layout; n/a maher | $20,000 |
| Feb 18, 2016 | Completed final sign-off Sep 2016 | 1281 28th Av | rev. to pa#201602089039 - to comply with complaint, remodel kitchen and rot repair in kind for breakfast nookDetails
rev. to pa#201602089039 - to comply with complaint, remodel kitchen and rot repair in kind for breakfast nook | $28,600 |
| Feb 8, 2016 | Completed final sign-off Sep 2016 | 1281 28th Av | remodel kitchen & in-kind breakfast nook.Details
remodel kitchen & in-kind breakfast nook. | $15,000 |
| May 24, 2012 | Completed final sign-off May 2013 | 806 22nd St | revision to 201106107879. omit half bath at 1st floor. kitchen moved in 1/2 bath space and living rm. got bigger for final inspectionDetails
revision to 201106107879. omit half bath at 1st floor. kitchen moved in 1/2 bath space and living rm. got bigger for final inspection | |
| Mar 24, 2009 | Completed final sign-off Dec 2009 | 323 Ralston St | top floor:plywood sub floor in kitchen,bath,hallway.8' opening in wall betwn kitch/din rm. gr fl:demolish internal stair (cover hole)new non bearing walls,replace windows w/door @ w wall.new column. cover w/5/8" plywood/hardieboard.subbsmt: 3 concrete piers,seal off door,replace wndw w/doorDetails
top floor:plywood sub floor in kitchen,bath,hallway.8' opening in wall betwn kitch/din rm. gr fl:demolish internal stair (cover hole)new non bearing walls,replace windows w/door @ w wall.new column. cover w/5/8" plywood/hardieboard.subbsmt: 3 concrete piers,seal off door,replace wndw w/door | $25,000 |
| Aug 4, 2008 | Completed final sign-off Dec 2009 | 323 Ralston St | top fl: remodel kitchen, bath, insulate, 5/8" sheetrock on open walls & ceilings. ground fl: sill anchors, insulate, 1/2 plywood on walls, 5/8 sheetrock on walls & ceiling. basement: sill anchors, insulate, 1/2 plywood on wallsDetails
top fl: remodel kitchen, bath, insulate, 5/8" sheetrock on open walls & ceilings. ground fl: sill anchors, insulate, 1/2 plywood on walls, 5/8 sheetrock on walls & ceiling. basement: sill anchors, insulate, 1/2 plywood on walls | $15,000 |