Wooley Landscapes
- Based in
- San Francisco
- On San Francisco permits
- Jul 2015 to Sep 2026
- Last 24 months
- 4 permits filed
19 permits since 2000: 13 completed, 3 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 98 days from filing to permit and 300 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 22, 2024 | Completed final sign-off Dec 2025 | 39 Encanto Av | nov 202429518- (n) retaining walls <4ft, terrace at rear yard, (n) deck w/footing of 2nd floor to rear yard, (n) concrete stairs at north side of rear yard, (n) door at (existing window) located over looking rear yard (n) fire rated wall at property lineDetails
nov 202429518- (n) retaining walls <4ft, terrace at rear yard, (n) deck w/footing of 2nd floor to rear yard, (n) concrete stairs at north side of rear yard, (n) door at (existing window) located over looking rear yard (n) fire rated wall at property line | $20,000 |
| Aug 2, 2024 | Completed final sign-off Apr 2025 | 1827 11th Av | to comply with nov 202418716, relocate of stair, new stair & railing construction. replace cmu block retaining along property lineDetails
to comply with nov 202418716, relocate of stair, new stair & railing construction. replace cmu block retaining along property line | $40,000 |
| Sep 27, 2017 | Completed final sign-off Nov 2018 | 635 Castro St | rear staircase replacement in kind.Details
rear staircase replacement in kind. | $10,000 |
| Jul 21, 2017 | Completed final sign-off Feb 2019 | 70 Carmelita St | remove and replace second story deck and staircase at the rear.Details
remove and replace second story deck and staircase at the rear. | $20,000 |
| Jul 8, 2015 | Completed final sign-off Feb 2017 | 115 06th Av | 2nd level deck 12' x 18'-6" with rap around bench / railing & a 12-13 step stair case. all redwood & pt lumber deck replacement. 12' x 18'-6" instead of 4' x 4' landing with 12 step stair case. rear deck 2nd story.Details
2nd level deck 12' x 18'-6" with rap around bench / railing & a 12-13 step stair case. all redwood & pt lumber deck replacement. 12' x 18'-6" instead of 4' x 4' landing with 12 step stair case. rear deck 2nd story. | $19,000 |