Back to kitchen remodel contractors
Woody's Restoration Services, Inc
- Based in
- San Rafael
- On San Francisco permits
- Dec 2001 to Mar 2015
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 6 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 19, 2015 | Completed final sign-off Jul 2015 | 775 25th Av | all work on 2nd level: remove/replace 2 windows in kind at rear. sand/refinish floors, replace sheetrock, install insulation in walls (r-13) & ceiling (r30), install smoke & co2 detectors, repair/replace electrical in kitchen including (n) light fixture. add 2 new closets in bedroom & office.Details
all work on 2nd level: remove/replace 2 windows in kind at rear. sand/refinish floors, replace sheetrock, install insulation in walls (r-13) & ceiling (r30), install smoke & co2 detectors, repair/replace electrical in kitchen including (n) light fixture. add 2 new closets in bedroom & office. | $45,000 |