Back to kitchen remodel contractors
Woltke & Argueta Construction
- Based in
- Oakland
- On San Francisco permits
- Jun 2011 to Apr 2013
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 4 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2011 | Completed final sign-off Sep 2011 | 1425 Kansas St | comply with complaint #201122503-provide new bathrm, new wood beam, wood post. enlarge bathrm, bedrm, add window opening. remodel kitchen at 2nd flr, remove (e) illegal kitchen (garage level) & provide new full bathrm & add new recreation. repair & fix (e) stairs with new, also provide new concDetails
comply with complaint #201122503-provide new bathrm, new wood beam, wood post. enlarge bathrm, bedrm, add window opening. remodel kitchen at 2nd flr, remove (e) illegal kitchen (garage level) & provide new full bathrm & add new recreation. repair & fix (e) stairs with new, also provide new conc | $30,000 |