Back to kitchen remodel contractors
Winner Design & Const.Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Aug 2013
- Last 24 months
- 0 permits filed
15 permits since 2000: 14 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 0 days from filing to permit and 45 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2011 | Completed final sign-off Oct 2011 | 239 25th Av | unit #4 kitchen remodel: remove existing kitchen cabinets, install new cabinet & granite countertop, painting finished. no wall relocation. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchen shall be high efficacy.Details
unit #4 kitchen remodel: remove existing kitchen cabinets, install new cabinet & granite countertop, painting finished. no wall relocation. a minimum of 50% of the total rated wattage of permanently installed lighting in kitchen shall be high efficacy. | $7,500 |
| Apr 29, 2011 | Completed final sign-off Jun 2011 | 239 25th Av | unit #2 - remove (e) kitchen cabinets; install (n) cabinets & countertops & kitchen appliances, painting finishes. no change to lighting.Details
unit #2 - remove (e) kitchen cabinets; install (n) cabinets & countertops & kitchen appliances, painting finishes. no change to lighting. | $4,000 |
| Mar 1, 2011 | Completed final sign-off Apr 2011 | 239 25th Av | remove (e) kitchen cabinets. repair wall covering. install new cabinets & paint. finish on unit #1Details
remove (e) kitchen cabinets. repair wall covering. install new cabinets & paint. finish on unit #1 | $3,000 |
| Apr 14, 2010 | Completed final sign-off Nov 2010 | 2121 Cabrillo St | remodel (e) kitchen include remove cabinet, install lights, cabinets & top,painting. remvoe plaster covering on hallway & living rm. install lights & recover drywall, painting,finished. at least 50% high efficacy lighting (by wattage)@ kitchen. living rm: high efficacy lighting @ controlled.Details
remodel (e) kitchen include remove cabinet, install lights, cabinets & top,painting. remvoe plaster covering on hallway & living rm. install lights & recover drywall, painting,finished. at least 50% high efficacy lighting (by wattage)@ kitchen. living rm: high efficacy lighting @ controlled. | $12,600 |
| Apr 26, 2007 | Completed final sign-off Jun 2007 | 2539 16th Av | remodel kitchen & bathroom paint finish. add 8 lights on ceiling new panel. change cabinets & top. at least 50% lighting wattage must be fluorescent in kitchen. bathroom fluorescent or motion sensor control.Details
remodel kitchen & bathroom paint finish. add 8 lights on ceiling new panel. change cabinets & top. at least 50% lighting wattage must be fluorescent in kitchen. bathroom fluorescent or motion sensor control. | $13,800 |