Windhorse & Associates Inc

Contractor license
277788
State license record
Based in
San Francisco
On San Francisco permits
May 2011 to Jun 2016
Last 24 months
0 permits filed

10 permits since 2000: 10 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllDeck 1Stairs 2Kitchen remodel 3Bathroom remodel 1

3 kitchen remodel permits: 3 completed. Typically 5 days from filing to permit and 242 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 18, 2016Completed
final sign-off Dec 2016
2646 19th Avreplace kitchen with same design, replace shower, vanity & toliet, replace two rear windows, replace 2 front windows, wood aluminum clad, repair stucco around front windows, replace kitchen and dinning room windows. window same size, same location, max u factor 0.32
Details
Permit
201604185003
Status
complete
Filed
Apr 18, 2016
Permit issued
Apr 18, 2016
Final sign-off
Dec 16, 2016
Declared cost
$40,000
Address
2646 19th Av

replace kitchen with same design, replace shower, vanity & toliet, replace two rear windows, replace 2 front windows, wood aluminum clad, repair stucco around front windows, replace kitchen and dinning room windows. window same size, same location, max u factor 0.32

Open the permit page

$40,000
Mar 27, 2015Completed
final sign-off Jun 2018
1770 35th Avkitchen and bathroom improvement to an extg residential building. removal of garage post, new wall config, and bathroom at ground level. no wet bar on ground level.
Details
Permit
201503272080
Status
complete
Filed
Mar 27, 2015
Permit issued
Apr 1, 2015
Final sign-off
Jun 29, 2018
Declared cost
$80,000
Address
1770 35th Av

kitchen and bathroom improvement to an extg residential building. removal of garage post, new wall config, and bathroom at ground level. no wet bar on ground level.

Open the permit page

$80,000
Jun 14, 2012Completed
final sign-off Nov 2012
749 26th Avremodel kitchen and remove extg bearing wall and install new beam at 2nd floor.
Details
Permit
201206142594
Status
complete
Filed
Jun 14, 2012
Permit issued
Jun 26, 2012
Final sign-off
Nov 20, 2012
Declared cost
$20,000
Address
749 26th Av

remodel kitchen and remove extg bearing wall and install new beam at 2nd floor.

Open the permit page

$20,000