Back to kitchen remodel contractors
Wilson Remodeling
- Based in
- San Anselmo
- On San Francisco permits
- Dec 2010 to Dec 2010
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 14 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 31, 2010 | Completed final sign-off May 2011 | 550 Davis St | remodel existing kitchen. cabinets, countertops. replace range, oven, sink, dishwasher, replace 1 8' light track and 1 down light and outlets with gfci, open 2' x5' opening in the wall between kitchen and living rm. no window, no door, no ceiling work on this permit. atleast 50% he lighting.Details
remodel existing kitchen. cabinets, countertops. replace range, oven, sink, dishwasher, replace 1 8' light track and 1 down light and outlets with gfci, open 2' x5' opening in the wall between kitchen and living rm. no window, no door, no ceiling work on this permit. atleast 50% he lighting. | $30,000 |