Back to kitchen remodel contractors
William Thoms Construction
- Based in
- Fairfax
- On San Francisco permits
- Feb 2000 to Nov 2014
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 8 days from filing to permit and 236 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 24, 2014 | Completed final sign-off Feb 2015 | 215 Masonic Av | install new kitchen cabinets, new floor covering, drywall repair, lighting, install new sink and faucetDetails
install new kitchen cabinets, new floor covering, drywall repair, lighting, install new sink and faucet | $28,000 |
| Apr 7, 2010 | Completed final sign-off Nov 2010 | 2646 Broderick St | remodel bathroom, no exterior work, no structural work, replace kitchen countertops, no electrical work.Details
remodel bathroom, no exterior work, no structural work, replace kitchen countertops, no electrical work. | $39,000 |
| Jul 5, 2005 | Completed final sign-off Mar 2008 | 3022 Buchanan St | exist 2 townhouses convert to 1 single family residence.both condo are own by puri-punian(1 is rebted) garage /basement level basically stays the same first occupancy level will be living,dining, kitchen & family rm. 2nd level will be 3 bedrooms, deck.Details
exist 2 townhouses convert to 1 single family residence.both condo are own by puri-punian(1 is rebted) garage /basement level basically stays the same first occupancy level will be living,dining, kitchen & family rm. 2nd level will be 3 bedrooms, deck. | $250,000 |
| Apr 25, 2001 | Completed final sign-off Jan 2002 | 659 Teresita Bl | kitchen remodel remove bearing wall and add beamDetails
kitchen remodel remove bearing wall and add beam | $25,000 |