Back to kitchen remodel contractors
William F Pell Construction
- Based in
- Mendocino
- On San Francisco permits
- Oct 2010 to Apr 2014
- Last 24 months
- 0 permits filed
36 permits since 2000: 21 completed, 4 never finaled, 11 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 1 completed, 2 expired or cancelled. Typically 4 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2011 | Completed final sign-off Dec 2011 | 2686 Green St | kitchen remodel on 1st fl -main floor. new beam, reinforce rear framing, remove bathroom and relocate kitchen sink and add new wine cellarDetails
kitchen remodel on 1st fl -main floor. new beam, reinforce rear framing, remove bathroom and relocate kitchen sink and add new wine cellar | $28,000 |
| Dec 30, 2010 | Expired or cancelled withdrawn Jan 2011 | 2680 Green St | voluntary seismic upgrade to residence. add new bathroom @ level 1 & legalize (e) office @ level 1. remodel 4 bathrooms & kitchen. remove portion of level 4 @ front to creat new balcony. replace furnace with new boiler & radiant heating.Details
voluntary seismic upgrade to residence. add new bathroom @ level 1 & legalize (e) office @ level 1. remodel 4 bathrooms & kitchen. remove portion of level 4 @ front to creat new balcony. replace furnace with new boiler & radiant heating. | $300,000 |
| Oct 5, 2010 | Expired or cancelled expired Jun 2014 | 2680 Green St | replace two existing showers at 3rd floor; reconfigure walls; add toilet to existing bathroom at 3rd floor; reconfigure kitchen counters; remove part of wall in kitchen.Details
replace two existing showers at 3rd floor; reconfigure walls; add toilet to existing bathroom at 3rd floor; reconfigure kitchen counters; remove part of wall in kitchen. | $25,000 |