West Coast Premier Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Feb 2001 to Jun 2026
- Last 24 months
- 5 permits filed
221 permits since 2000: 191 completed, 1 in progress, 15 never finaled, 14 expired or cancelled.
Of the 15 never-finaled permits, 1 is 3 to 5 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2017 | Completed final sign-off Nov 2017 | 540 Cole St | rear building - replacement of (e) wood beam with kind, foundation mudsill anchor bolts and wood stud bracing with plywood and repair of wood stairs. reference permit #201502027205.Details
rear building - replacement of (e) wood beam with kind, foundation mudsill anchor bolts and wood stud bracing with plywood and repair of wood stairs. reference permit #201502027205. | $22,000 |
| May 4, 2017 | Completed final sign-off Jun 2017 | 417 Hyde St | comply with nov 201773971 lightbulbs, hallway corridors, stair. comply for notice of violaton 201775291 ceiling repair bathroom. no plumbing/electrical this permit . no exterior work. n/a maherDetails
comply with nov 201773971 lightbulbs, hallway corridors, stair. comply for notice of violaton 201775291 ceiling repair bathroom. no plumbing/electrical this permit . no exterior work. n/a maher | $6,000 |
| May 15, 2014 | Completed final sign-off Apr 2016 | 1315 Ulloa St | revision to permit #201404163413. foundation & seismic upgrade. add new anchor bolt, new plywood panel, replace front entry stairs to comply with violation #201452552. replacement of all windows & add drywall. 1/f remodel of (e) full bath, 2/f 1/2 bath, add 3/f full bath.Details
revision to permit #201404163413. foundation & seismic upgrade. add new anchor bolt, new plywood panel, replace front entry stairs to comply with violation #201452552. replacement of all windows & add drywall. 1/f remodel of (e) full bath, 2/f 1/2 bath, add 3/f full bath. | $95,000 |
| Aug 8, 2012 | Completed final sign-off Nov 2012 | 2728 Hyde St | install a secondary convienient stairs between 1st & 2nd floors. this stair is not the main means of egress, as there are 2 other main stairs serving the building. no exterior workDetails
install a secondary convienient stairs between 1st & 2nd floors. this stair is not the main means of egress, as there are 2 other main stairs serving the building. no exterior work | $25,000 |
| Aug 2, 2007 | Completed final sign-off Oct 2007 | 2728 Hyde St | install a secondary convenience stair between ground and 2/f. this stair is not the main means of egress, as there are 2 other main stairs serving the bldg. no exterior work.Details
install a secondary convenience stair between ground and 2/f. this stair is not the main means of egress, as there are 2 other main stairs serving the bldg. no exterior work. | $30,000 |
| Jan 16, 2007 | Expired or cancelled expired Jan 2011 | 417 Hyde St | increase valuation of pa# 200610256005 & 200611298676 by $20k to include replacement of ceiling with 2 layers of type & sheetrock and provide 2 hour stair assembly & relocate toilet in basement.Details
increase valuation of pa# 200610256005 & 200611298676 by $20k to include replacement of ceiling with 2 layers of type & sheetrock and provide 2 hour stair assembly & relocate toilet in basement. | $20,000 |
| Feb 18, 2004 | Completed final sign-off Aug 2004 | 400 02nd St | remove (e) stair and infill floor with 6" concrete slab. this stair does not serve as access or patDetails
remove (e) stair and infill floor with 6" concrete slab. this stair does not serve as access or pat | $5,000 |
| Nov 13, 2003 | Completed final sign-off Aug 2004 | 25 Sutter St | tenant improvement only ltd to 2nd floor new shower, cabinetry raceway elec (n) handrails to stairsDetails
tenant improvement only ltd to 2nd floor new shower, cabinetry raceway elec (n) handrails to stairs | $20,000 |