Back to kitchen remodel contractors
Wen Jian Wen
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Oct 2007
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2007 | Completed final sign-off Mar 2008 | 2264 18th Av | remove non-bearing wall at kitchenDetails
remove non-bearing wall at kitchen | |
| Sep 27, 2007 | Completed final sign-off Mar 2008 | 2264 18th Av | replace cabinet and sink in one kitchen. replace bathtub and sink in one bathDetails
replace cabinet and sink in one kitchen. replace bathtub and sink in one bath | $11,000 |
| Dec 28, 2006 | Expired or cancelled expired Jan 2012 | 495 Country Club Dr | lower floor remodel storage area to have bathroom wine cellar and storage room. on upper floor remodel kitchen, bathrooms and master bathroom. all work are within the envelope of the existing building.Details
lower floor remodel storage area to have bathroom wine cellar and storage room. on upper floor remodel kitchen, bathrooms and master bathroom. all work are within the envelope of the existing building. | $65,000 |
| Nov 9, 2006 | Completed final sign-off Apr 2007 | 1542 25th Av | remodel (e) kitchen on 2nd floor. include (n) cabinet. (n) plumbing & (n) eelctrical, (n) floor. flourescent lighting.Details
remodel (e) kitchen on 2nd floor. include (n) cabinet. (n) plumbing & (n) eelctrical, (n) floor. flourescent lighting. | $7,200 |