Permit GraphShortlistSan Francisco building permits since 2000

Weis & Son

Contractor license
847785
State license record
Based in
Mill Valley
On San Francisco permits
Oct 2010 to Apr 2022
Last 24 months
0 permits filed

5 permits since 2000: 5 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllKitchen remodel 1Bathroom remodel 2

1 kitchen remodel permit: 1 completed. Typically 2 days from filing to permit and 189 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Oct 18, 2010Completed
final sign-off Apr 2011
40 Russell Stelectrical upgrade to 200 amps & 3 meters, add forced air furnace both units. remove 1 structural wall both units, new kitchen both units, new bath tiolet & sink (both units), refinish floors, replace water heaters, plumbing & electical modific. as required in both units. insulate ceiling upper unit
Details
Permit
201010183184
Status
complete
Filed
Oct 18, 2010
Permit issued
Oct 20, 2010
Final sign-off
Apr 27, 2011
Declared cost
$90,000
Address
40 Russell St

electrical upgrade to 200 amps & 3 meters, add forced air furnace both units. remove 1 structural wall both units, new kitchen both units, new bath tiolet & sink (both units), refinish floors, replace water heaters, plumbing & electical modific. as required in both units. insulate ceiling upper unit

Open the permit page

$90,000