Wei Ouyang Dba Ouyang Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2018 to Jul 2019
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 193 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2019 | Completed final sign-off Jul 2019 | 173 10th Av | remodel kitchen replace cabinets, sink, exhaused hood, lighting in (e) location without change. remodel (2) bathrooms, replace sink, cabinet, (1) shower, (2) toilets, (1) bath-tub in (e) location without change, replace wooden handrail of back yard, outside stair and dry rot if neededDetails
remodel kitchen replace cabinets, sink, exhaused hood, lighting in (e) location without change. remodel (2) bathrooms, replace sink, cabinet, (1) shower, (2) toilets, (1) bath-tub in (e) location without change, replace wooden handrail of back yard, outside stair and dry rot if needed | $42,500 |