Wei Fu Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to May 2025
- Last 24 months
- 3 permits filed
8 permits since 2000: 7 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 388 days from filing to permit and 1585 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 15, 2019 | Completed final sign-off Jun 2024 | 740 Shotwell St | excavation (e) bldg to add basement(2nd unit), (e) 2 flrs to be remodeld & combined into 1 unit, horizontal addition @ south rear side @ 2nd flr. west rear addition converts (e) roof deck @ 2nd flr into liveable space, vertical addition of roof deck above (n) liveable space. solar panels @ roof.Details
excavation (e) bldg to add basement(2nd unit), (e) 2 flrs to be remodeld & combined into 1 unit, horizontal addition @ south rear side @ 2nd flr. west rear addition converts (e) roof deck @ 2nd flr into liveable space, vertical addition of roof deck above (n) liveable space. solar panels @ roof. | $140,000 |