Back to kitchen remodel contractors
Waters Construction & Plumbing Co.
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Oct 2019
- Last 24 months
- 0 permits filed
38 permits since 2000: 21 completed, 10 never finaled, 7 expired or cancelled.
Of the 10 never-finaled permits, 1 is 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 172 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 11, 2014 | Completed final sign-off Jul 2015 | 1053 South Van Ness Av | work being done on cottage bldg in back of lot. sfd. remodel kitchen and bathroom, replace fixtures, new cabinets, counter top, new sink, dishwasher. repair roof rafters and dryrot repair in bath floor & walls. new lav & shower with new tile. repair dryrot in kitchen floor.Details
work being done on cottage bldg in back of lot. sfd. remodel kitchen and bathroom, replace fixtures, new cabinets, counter top, new sink, dishwasher. repair roof rafters and dryrot repair in bath floor & walls. new lav & shower with new tile. repair dryrot in kitchen floor. | $25,000 |
| Nov 4, 2013 | Completed final sign-off Jan 2014 | 1040 Revere Av | ti fo0r commercial kitchen. install 4 sinks, new 2x6 wall with 5/8 rock both sides and door, lighting. lever hardware @ new doors. no structural work.Details
ti fo0r commercial kitchen. install 4 sinks, new 2x6 wall with 5/8 rock both sides and door, lighting. lever hardware @ new doors. no structural work. | $1,800 |
| Jan 12, 2007 | Never finaled issued Jan 2007, no final | 114 Jersey St | repair dry rot at back portion of roof & re-shingle area 6' x 10'. replace countertop for kitchen & new plumbing & electrical. remodel bathroom, new tub, lav, & cab. remove broken plaster & replace with rock approx 300 sq. ft. may just cover living room with 1/4 rock to make look right.Details
repair dry rot at back portion of roof & re-shingle area 6' x 10'. replace countertop for kitchen & new plumbing & electrical. remodel bathroom, new tub, lav, & cab. remove broken plaster & replace with rock approx 300 sq. ft. may just cover living room with 1/4 rock to make look right. | $13,000 |
| Jul 21, 2006 | Completed final sign-off Apr 2007 | 817 Pierce St | repair fire damage to deck & kitchen area repace siding & sheetrodk where needed comply with nov19920092 number 2 no work in bedrooms ano windows in bedrooms no door replacementDetails
repair fire damage to deck & kitchen area repace siding & sheetrodk where needed comply with nov19920092 number 2 no work in bedrooms ano windows in bedrooms no door replacement | $30,000 |
| Oct 20, 2003 | Completed final sign-off Feb 2004 | 1314 Ocean Av | install gas stove, fryer & hood & broiler as per plans.kitchen equip & mech equip work.Details
install gas stove, fryer & hood & broiler as per plans.kitchen equip & mech equip work. | $14,000 |