Back to kitchen remodel contractors
Water Mold Fire Restoration Inc
- Based in
- San Rafael
- On San Francisco permits
- Jan 2022 to Apr 2022
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 109 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 25, 2022 | Never finaled issued Jan 2022, no final | 1011 23rd St | unit# 9. mitigation work do to water damage, affected drywall, instulation , bases, floor coverings, lower kitchen cabs, ext to be removed and structure to be driedDetails
unit# 9. mitigation work do to water damage, affected drywall, instulation , bases, floor coverings, lower kitchen cabs, ext to be removed and structure to be dried | $6,000 |
| Jan 21, 2022 | Completed final sign-off May 2022 | 5264 03rd St | to comply with complaint #202286366. mitigation work due to water loss, affected drywall, insulation, base floor coverings. lower kitchen cabs, etc., to be removed and structure to be dried.Details
to comply with complaint #202286366. mitigation work due to water loss, affected drywall, insulation, base floor coverings. lower kitchen cabs, etc., to be removed and structure to be dried. | $10,000 |