Back to kitchen remodel contractors
Warren Manh Young
- Based in
- South San Francisco
- On San Francisco permits
- Aug 2011 to May 2022
- Last 24 months
- 0 permits filed
25 permits since 2000: 20 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 6 completed, 3 never finaled. Typically 9 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2022 | Completed final sign-off Jan 2023 | 562 30th Av | 1st fl. add a media room, office, full bathroom 2nd fl. remodel (e) kitchen in-kind, replace one lavatory, replace shower stall with water closet, add a lavtoryDetails
1st fl. add a media room, office, full bathroom 2nd fl. remodel (e) kitchen in-kind, replace one lavatory, replace shower stall with water closet, add a lavtory | $68,000 |
| May 6, 2019 | Completed final sign-off Feb 2020 | 809 Noriega St | kitchen & 3 bathroom remodel as alike. replace 6 (e) windows in the rear. not visible from street. same size same location, u is 0.32 maxDetails
kitchen & 3 bathroom remodel as alike. replace 6 (e) windows in the rear. not visible from street. same size same location, u is 0.32 max | $48,500 |
| Nov 15, 2017 | Never finaled issued Nov 2017, no final | 479 20th Av | kitchen : change cabinetry only. no structural work. bathroom: change tub, sink, toilet, tile floor, paint and install fixtures only. all work in unit 479 which is locted on the 3rd floor.Details
kitchen : change cabinetry only. no structural work. bathroom: change tub, sink, toilet, tile floor, paint and install fixtures only. all work in unit 479 which is locted on the 3rd floor. | $10,500 |
| May 5, 2016 | Completed final sign-off Nov 2016 | 1640 Washington St | unit #4 comply with nov 201608641 and 201608642. replace gfci outlet in bath, install 2 direct vent gas heathers. install vinyl missing tile in kitchen floor, low volt wiring and windows not visible from street.Details
unit #4 comply with nov 201608641 and 201608642. replace gfci outlet in bath, install 2 direct vent gas heathers. install vinyl missing tile in kitchen floor, low volt wiring and windows not visible from street. | $2,850 |
| Apr 19, 2016 | Completed final sign-off Jan 2018 | 1825 Post St | ste 215: interior renovation at kitchen area only. no work visible from street. no change of use per plan.Details
ste 215: interior renovation at kitchen area only. no work visible from street. no change of use per plan. | $50,000 |
| Apr 30, 2015 | Completed final sign-off Dec 2018 | 1526 22nd Av | unit legalization ordinance 43-14. new 20 min fire door, new gfci outlet at ground floor kitchen counter. legalized 2nd family dwelling. provide second existing for second floor.Details
unit legalization ordinance 43-14. new 20 min fire door, new gfci outlet at ground floor kitchen counter. legalized 2nd family dwelling. provide second existing for second floor. | $1,775 |
| Apr 30, 2015 | Never finaled filed Apr 2015, never issued | 1518 19th Av | unit legalization ordinance 43-14. new gfci outlet at ground floor kitchen counter.new utilities door. new t/r outlet at ground floor bedroom. & legalized ground floor to comply with code enforcemtn#200561177.Details
unit legalization ordinance 43-14. new gfci outlet at ground floor kitchen counter.new utilities door. new t/r outlet at ground floor bedroom. & legalized ground floor to comply with code enforcemtn#200561177. | $2,960 |
| Sep 29, 2014 | Never finaled issued May 2015, no final | 1507 33rd Av | legalize kitchen area install upgrade 50 amp for stove 2 gfci outlet and hood vent to exteriorDetails
legalize kitchen area install upgrade 50 amp for stove 2 gfci outlet and hood vent to exterior | $1,550 |
| Aug 17, 2011 | Completed final sign-off Nov 2011 | 1835 29th Av | upgrade service, install 3 outlets, 5 ceiling lights, 2 switches @ basement. replace new cabinet, counter top, sink, faucet, gfci outlet, tile floor in kitchen.Details
upgrade service, install 3 outlets, 5 ceiling lights, 2 switches @ basement. replace new cabinet, counter top, sink, faucet, gfci outlet, tile floor in kitchen. | $4,260 |