Back to kitchen remodel contractors
Warren Fang
- Based in
- Millbrae
- On San Francisco permits
- Feb 2000 to Dec 2017
- Last 24 months
- 0 permits filed
12 permits since 2000: 8 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 95 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 29, 2017 | Completed final sign-off Jan 2024 | 295 Orizaba Av | comply nov 201709421. remove (e) kitchen to (n) storage. (n) ada restroom, (n) mop sink. close door between restaurant & store. all work in commercial spaceDetails
comply nov 201709421. remove (e) kitchen to (n) storage. (n) ada restroom, (n) mop sink. close door between restaurant & store. all work in commercial space | $15,000 |
| Nov 1, 2017 | Completed final sign-off Dec 2025 | 24 Randolph St | comply w/ complaint #201713653 & #201711441. legalization of dwelling unit installed w/o permit. unit legalization ord 43-14. legalization kitchen, bathrm. all work at ground floor.Details
comply w/ complaint #201713653 & #201711441. legalization of dwelling unit installed w/o permit. unit legalization ord 43-14. legalization kitchen, bathrm. all work at ground floor. | $32,000 |
| Oct 20, 2017 | Completed final sign-off May 2018 | 288 Farallones St | legalize kitchen in a dwelling unit. unit legalization per ord #43-14.Details
legalize kitchen in a dwelling unit. unit legalization per ord #43-14. | $3,000 |
| Feb 28, 2011 | Completed final sign-off Mar 2011 | 1878 32nd Av | window replacement in kitchen facing backyard.Details
window replacement in kitchen facing backyard. | $500 |
| Sep 3, 2009 | Expired or cancelled expired Jan 2012 | 284 Broad St | remodel upstair kitchen & bathroom - kitchen: change cabinet & counter. bathroom: replace plumbing fixture & retile floor & walls. no structural work.Details
remodel upstair kitchen & bathroom - kitchen: change cabinet & counter. bathroom: replace plumbing fixture & retile floor & walls. no structural work. | $20,000 |
| Aug 13, 2007 | Completed final sign-off Nov 2007 | 827 Goettingen St | remove & replace cabinets & counter upstair kitchen and bathroom (no lighting change)Details
remove & replace cabinets & counter upstair kitchen and bathroom (no lighting change) | $12,000 |
| Jan 10, 2006 | Completed final sign-off Jun 2006 | 288 Farallones St | convert storage space on first floor to family room and mech area remodel kitchen on second floor (convert 466 sq to habitable) replace all existing windows (front and right side remove and replace with wood windows total 466 sq. ftDetails
convert storage space on first floor to family room and mech area remodel kitchen on second floor (convert 466 sq to habitable) replace all existing windows (front and right side remove and replace with wood windows total 466 sq. ft | $40,000 |