Permit GraphShortlistSan Francisco building permits since 2000

Warda Construction

Contractor license
866380
State license record
Based in
Somerset
On San Francisco permits
Sep 2009 to Sep 2011
Last 24 months
0 permits filed

3 permits since 2000: 2 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllStairs 1

1 stairs permit: 1 completed. Typically 9 days from filing to permit and 349 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 7, 2011Completed
final sign-off May 2012
184 Upland Dr(e) front exterior stair to be re-built due to moisture damage. replace with similar stair design. wrought iron railings to be upgraded to current code standards.
Details
Permit
201106077594
Status
complete
Filed
Jun 7, 2011
Permit issued
Jun 16, 2011
Final sign-off
May 30, 2012
Declared cost
$20,000
Address
184 Upland Dr

(e) front exterior stair to be re-built due to moisture damage. replace with similar stair design. wrought iron railings to be upgraded to current code standards.

Open the permit page

$20,000