Wals Construction
- Based in
- San Anselmo
- On San Francisco permits
- Sep 2009 to Sep 2010
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 1 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2009 | Completed final sign-off Mar 2010 | 272 Connecticut St | work on unit#272 only.revision to p/a 2009.0903.6102: comply with nov# 20073600-correction of rear stairway (2nd means of egress) to reflect adjustments to comply with nov# 200922022 dated 9/21/09, reduce rear yard landings from 4'-8" to 38" depth.Details
work on unit#272 only.revision to p/a 2009.0903.6102: comply with nov# 20073600-correction of rear stairway (2nd means of egress) to reflect adjustments to comply with nov# 200922022 dated 9/21/09, reduce rear yard landings from 4'-8" to 38" depth. | $1,500 |
| Sep 17, 2009 | Completed final sign-off Mar 2010 | 272 Connecticut St | correction to originally approved pa# 2009-0903-6102-correction a dimension to landing of rem stair that is attached to bldg, actual original dept was 57" instead of 37"-error in drafting, would not clear (e) retaining wall below. life safety (if required) under separate permits.Details
correction to originally approved pa# 2009-0903-6102-correction a dimension to landing of rem stair that is attached to bldg, actual original dept was 57" instead of 37"-error in drafting, would not clear (e) retaining wall below. life safety (if required) under separate permits. | |
| Sep 3, 2009 | Completed final sign-off Mar 2010 | 272 Connecticut St | replace rear of building stairway used as second means of egress "in-kind"Details
replace rear of building stairway used as second means of egress "in-kind" | $15,000 |