W D S Construction Inc

Contractor license
978845
State license record
Based in
Beaver Dam
On San Francisco permits
Jul 2019 to Apr 2023
Last 24 months
0 permits filed

6 permits since 2000: 5 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllStairs 3

3 stairs permits: 3 completed. Typically 53 days from filing to permit and 250 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 17, 2023Completed
final sign-off Sep 2023
285 Winston Drminor t.i. on level1: work includes enclosing existing stairs & escalators, new partitions to create vestibules at existing stairs, new partitions at new fire -riser rm to be separated from leasble area, replacing existing doors w/double doors for increased exit capacity.
Details
Permit
202304175834
Status
complete
Filed
Apr 17, 2023
Permit issued
May 11, 2023
Final sign-off
Sep 26, 2023
Declared cost
$162,800
Address
285 Winston Dr

minor t.i. on level1: work includes enclosing existing stairs & escalators, new partitions to create vestibules at existing stairs, new partitions at new fire -riser rm to be separated from leasble area, replacing existing doors w/double doors for increased exit capacity.

Open the permit page

$162,800
Sep 26, 2020Completed
final sign-off Jul 2021
285 Winston Drshop drawings for steel stairs in gridlines a-a.5/8-9 and g5-h.5/7-8. see pa #2019-0701-4861 for arch core/shell permit.
Details
Permit
202009265076
Status
complete
Filed
Sep 26, 2020
Permit issued
Nov 18, 2020
Final sign-off
Jul 26, 2021
Declared cost
$125,000
Address
285 Winston Dr

shop drawings for steel stairs in gridlines a-a.5/8-9 and g5-h.5/7-8. see pa #2019-0701-4861 for arch core/shell permit.

Open the permit page

$125,000
Jul 2, 2019Completed
final sign-off Jul 2021
233 Winston Drmarket building j. three new openings between (e) anchor building and (e) market building j for a single tenant across the 2 anchor buildings over two floors. reconfigure ramps and stairs at loading dock. interior work. ref 2019-0701-4861 sprinkler/fire alarm under sep permit.
Details
Permit
201907025009
Status
complete
Filed
Jul 2, 2019
Permit issued
Oct 2, 2020
Final sign-off
Jul 26, 2021
Declared cost
$100,000
Address
233 Winston Dr

market building j. three new openings between (e) anchor building and (e) market building j for a single tenant across the 2 anchor buildings over two floors. reconfigure ramps and stairs at loading dock. interior work. ref 2019-0701-4861 sprinkler/fire alarm under sep permit.

Open the permit page

$100,000