Back to kitchen remodel contractors
Vpm General Building Llc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Aug 2025
- Last 24 months
- 1 permit filed
8 permits since 2000: 6 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 2 never finaled. Typically 0 days from filing to permit and 72 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2022 | Completed final sign-off Jun 2023 | 502 Vidal Dr | to comply with nov 202029361: repair fire water damage. replace upper cabinets. scrape plaster walls, paint walls. kitchen area. all casework to be replaced in kind and location.Details
to comply with nov 202029361: repair fire water damage. replace upper cabinets. scrape plaster walls, paint walls. kitchen area. all casework to be replaced in kind and location. | $5,000 |
| Jun 11, 2020 | Never finaled issued Jun 2020, no final | 502 Arballo Dr | replace kitchen cabinets and countertops. no new walls, no existing wall relocation.Details
replace kitchen cabinets and countertops. no new walls, no existing wall relocation. | $6,000 |
| May 26, 2020 | Never finaled issued May 2020, no final | 538 Arballo Dr | replace kitchen cabinets and countertops, no new walls, no existing wall relocation. kitchen remodel in-kind.Details
replace kitchen cabinets and countertops, no new walls, no existing wall relocation. kitchen remodel in-kind. | $6,000 |
| Oct 2, 2019 | Completed final sign-off Oct 2019 | 422 Garces Dr | replace kitchen cabinets and countertop. no new wall. no existing wall relocation comply with violation 201862002Details
replace kitchen cabinets and countertop. no new wall. no existing wall relocation comply with violation 201862002 | $5,000 |
| Jul 23, 2019 | Completed final sign-off Oct 2019 | 423 Vidal Dr | kitchen remodel: work limited to replace kitchen cabinets and countertop. no new wall and no existing wall relocation. to comply with violation #201970141.Details
kitchen remodel: work limited to replace kitchen cabinets and countertop. no new wall and no existing wall relocation. to comply with violation #201970141. | $1,200 |