Vincent Jordan Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Sep 2010
- Last 24 months
- 0 permits filed
9 permits since 2000: 5 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2010 | Never finaled issued Sep 2010, no final | 10 Otsego Av | rot repair on deck & stairs. repair as is. no change in dimensions. repair as is in backyard. 50% rot repairDetails
rot repair on deck & stairs. repair as is. no change in dimensions. repair as is in backyard. 50% rot repair | $7,000 |
| Nov 17, 2008 | Completed final sign-off Jul 2009 | 911 Innes Av | rot repair to stairs rotton treads side of house less than 50%.Details
rot repair to stairs rotton treads side of house less than 50%. | $6,000 |
| Mar 9, 2006 | Completed final sign-off Jun 2006 | 10 Otsego Av | repair rot in stairs & deck and floor area near door & new door frame replaced in kind. repair work is less than 50% of (e).Details
repair rot in stairs & deck and floor area near door & new door frame replaced in kind. repair work is less than 50% of (e). | $2,000 |
| Mar 8, 2006 | Completed final sign-off Jun 2006 | 627 Castro St | repair dryrot @ rear stairs, replace fire extinguish ers, check & repair bath fan in unit 629, repair kitchen counter in unit 629, install light fixture @ front main stairs, replace flooring & subfloor @Details
repair dryrot @ rear stairs, replace fire extinguish ers, check & repair bath fan in unit 629, repair kitchen counter in unit 629, install light fixture @ front main stairs, replace flooring & subfloor @ | $10,000 |