Back to kitchen remodel contractors
Vincent Construction Group Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Jan 2014
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 29 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 17, 2010 | Completed final sign-off Dec 2010 | 1409 Sanchez St | revision to pa# 2008.10.20.4546 ( new const). change elevation design, change fl plan at bsmnt and 1st fl. relocate int.stairway. move kitchen from bsmnt to 1st fl. bedrm to basement fl from 1st floor.Details
revision to pa# 2008.10.20.4546 ( new const). change elevation design, change fl plan at bsmnt and 1st fl. relocate int.stairway. move kitchen from bsmnt to 1st fl. bedrm to basement fl from 1st floor. |