Vieira Firm Construction & Design
- Based in
- Burlingame
- On San Francisco permits
- Aug 2024 to Oct 2025
- Last 24 months
- 4 permits filed
5 permits since 2000: 3 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 27 days from filing to permit and 459 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2024 | Completed final sign-off Dec 2025 | 929 Darien Wy | remodel (e) kitchen, add master bedrm, reconfigure lower floor with an in-suite bedrm, powder and laundry. also reconfigure the (e) stair, replace & upgrade (e) windows & doors. there is no horizontal or vertical expansion w/structural mep per planDetails
remodel (e) kitchen, add master bedrm, reconfigure lower floor with an in-suite bedrm, powder and laundry. also reconfigure the (e) stair, replace & upgrade (e) windows & doors. there is no horizontal or vertical expansion w/structural mep per plan | $250,000 |