Back to kitchen remodel contractors
Victory Construction Co
- Based in
- Oakland
- On San Francisco permits
- Dec 2007 to Mar 2026
- Last 24 months
- 1 permit filed
9 permits since 2000: 6 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 in progress. Typically 0 days from filing to permit and 177 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 12, 2026 | In progress issued Jun 2026 | 2462 17th Av | legalize (e)unit @ lower fl w/ lowering of floor, comply w/nov 202313090. update (e) kitchen & bath w/ ventilation.provide egress requirements.correct action for novs ref.pa# 202406053753.nov 202313092-remove metal gate in front of garage door.nov 202309577:repair/repaint wall by tub and repair fan.Details
legalize (e)unit @ lower fl w/ lowering of floor, comply w/nov 202313090. update (e) kitchen & bath w/ ventilation.provide egress requirements.correct action for novs ref.pa# 202406053753.nov 202313092-remove metal gate in front of garage door.nov 202309577:repair/repaint wall by tub and repair fan. | $88,250 |
| Jan 17, 2008 | Completed final sign-off Jul 2008 | 1243 Pine St | work @ unit# 8 only. remodel kitchen & bathroom. change bath tub & toilet, floor, cabinets, counter top. (e) light fixtures to remain. no structural work.Details
work @ unit# 8 only. remodel kitchen & bathroom. change bath tub & toilet, floor, cabinets, counter top. (e) light fixtures to remain. no structural work. | $4,000 |
| Dec 27, 2007 | Completed final sign-off Jun 2008 | 1141 Cayuga Av | rearrange walls, rooms and relocate bathrooms. replace ex. windows in-kind, relocate water heater, furnance and laundry, alter ex. stairs at ground floor. add a half bath and relocate door on the 2nd floor. remodel kitchen. dry rot repair on the front stair.Details
rearrange walls, rooms and relocate bathrooms. replace ex. windows in-kind, relocate water heater, furnance and laundry, alter ex. stairs at ground floor. add a half bath and relocate door on the 2nd floor. remodel kitchen. dry rot repair on the front stair. | $60,000 |