Victor Lorenzo Ledo
- Based in
- San Pablo
- On San Francisco permits
- Feb 2002 to Jul 2003
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 25 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2002 | Completed final sign-off Nov 2002 | 27 Scott St | horizontal addition-kitchen remodel, new built-in cabs & shelves, new french doors & replacement winDetails
horizontal addition-kitchen remodel, new built-in cabs & shelves, new french doors & replacement win | $50,000 |
| Feb 13, 2002 | Completed final sign-off May 2002 | 1210 12th Av | remove load bearing wall & replace with beam, install kitchen rewire &replumb as required.Details
remove load bearing wall & replace with beam, install kitchen rewire &replumb as required. | $18,000 |