Velocity Remediation Llc
- Based in
- South San Francisco
- On San Francisco permits
- Jul 2026 to Sep 2026
- Last 24 months
- 4 permits filed
4 permits since 2000: 1 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 in progress. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Jul 2026 | 1600 Webster St | replace insulation & drywall in stairwell that was removed from water damage. first floor stair well (not street visible). no stud replacement. drywall shall be 2-layer 5/8" type x gyp board e.f. wall area not exceed 80 sqft. scope of work not located in commercial space.Details
replace insulation & drywall in stairwell that was removed from water damage. first floor stair well (not street visible). no stud replacement. drywall shall be 2-layer 5/8" type x gyp board e.f. wall area not exceed 80 sqft. scope of work not located in commercial space. | $3,225 |