Back to kitchen remodel contractors
Vector Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2005 to Sep 2008
- Last 24 months
- 0 permits filed
17 permits since 2000: 16 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2008 | Completed final sign-off Nov 2008 | 965 Alvarado St | unit#2,#5 & #6 remodel (e) kitchen & bathroom. no structure work. dryrot repair under #6 window u <0.67. & bath tub, lighting to comply with title 24Details
unit#2,#5 & #6 remodel (e) kitchen & bathroom. no structure work. dryrot repair under #6 window u <0.67. & bath tub, lighting to comply with title 24 | $50,000 |
| Feb 15, 2008 | Completed final sign-off Nov 2008 | 965 Alvarado St | work @ unit# 1, # 3 & # 4 onlyl. remodel (e) kitchens & bathrooms.Details
work @ unit# 1, # 3 & # 4 onlyl. remodel (e) kitchens & bathrooms. | $43,000 |
| Oct 1, 2007 | Completed final sign-off Jan 2008 | 158 Beulah St | remodel (e) kitchen,install new headers,posts,partitions, new plumbing & appliances (in place).new lighting per t24 & outlets, repalce 6 windows, replace water heater, refurbished gas fireplace, new laundry closet. work on top floor onlyDetails
remodel (e) kitchen,install new headers,posts,partitions, new plumbing & appliances (in place).new lighting per t24 & outlets, repalce 6 windows, replace water heater, refurbished gas fireplace, new laundry closet. work on top floor only | $20,000 |
| May 4, 2007 | Completed final sign-off Jun 2007 | 426 22nd Av | apt. #1: kitchen: replace countertop, cabinets, sink and faucet. no new lighting.; bathroom: new tile floor, replace sink, faucet, bathtub and shower valve. no new lighting. comply with complaint #200680308Details
apt. #1: kitchen: replace countertop, cabinets, sink and faucet. no new lighting.; bathroom: new tile floor, replace sink, faucet, bathtub and shower valve. no new lighting. comply with complaint #200680308 | $8,000 |
| Jul 17, 2006 | Completed final sign-off Jun 2007 | 570 Guerrero St | remodel (e) 4 kitchens and 4 bathrooms with new cabinets. countertops, sinks, fixtures, apt#2.3.4.6.Details
remodel (e) 4 kitchens and 4 bathrooms with new cabinets. countertops, sinks, fixtures, apt#2.3.4.6. | $35,000 |
| Apr 27, 2006 | Completed final sign-off Jun 2006 | 2048 Wawona St | remodel (e) kitchen & bathroom with new cabinets countertops, sink, fixtures. no structural work, no new walls. all lighting to be high efficiency per mechanical code / electrical.Details
remodel (e) kitchen & bathroom with new cabinets countertops, sink, fixtures. no structural work, no new walls. all lighting to be high efficiency per mechanical code / electrical. | $15,000 |
| Jun 28, 2005 | Completed final sign-off Oct 2005 | 807 24th Av | remodel kitchen, replace cabs, flr tiles, counter, sink, appliances, etc, renew drywall & paint in kDetails
remodel kitchen, replace cabs, flr tiles, counter, sink, appliances, etc, renew drywall & paint in k | $8,000 |