Vcc, Llc
- Based in
- Little Rock
- On San Francisco permits
- Nov 2017 to Apr 2021
- Last 24 months
- 0 permits filed
28 permits since 2000: 23 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 6 completed, 1 never finaled. Typically 121 days from filing to permit and 712 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2020 | Completed final sign-off Oct 2021 | 400 Winston Dr | revision to pa 201711284984. removal and replacement of spray applied fire resistive material with intumescent fire resistive material on the underside of structural steel members located in exit stair 4 and exit stair 9.Details
revision to pa 201711284984. removal and replacement of spray applied fire resistive material with intumescent fire resistive material on the underside of structural steel members located in exit stair 4 and exit stair 9. | |
| Sep 14, 2020 | Completed final sign-off Oct 2021 | 3251 20th Av | shop drawing deferred permit for glass railing system & glass guardrail for level 1 & 2, section e; escalator, ramp & stairs. ref arch pa# 201802201700. level 2, section g escalator guardrail. ref arch pa# 201711224699.Details
shop drawing deferred permit for glass railing system & glass guardrail for level 1 & 2, section e; escalator, ramp & stairs. ref arch pa# 201802201700. level 2, section g escalator guardrail. ref arch pa# 201711224699. | $20,000 |
| Feb 20, 2020 | Never finaled issued Mar 2020, no final | 400 Winston Dr | steel stair structural shop drawings for regal theater. see app#201809119767 for arch. reference.Details
steel stair structural shop drawings for regal theater. see app#201809119767 for arch. reference. | |
| Sep 23, 2019 | Completed final sign-off Oct 2021 | 400 Winston Dr | shop drawing steel stairs for former macys anchor building see pa 201711284984Details
shop drawing steel stairs for former macys anchor building see pa 201711284984 | $1,000 |
| Apr 26, 2019 | Completed final sign-off Oct 2021 | 400 Winston Dr | revision to pa 201711284984. revise stair 6 layout, add curb at storefront, add canopy at level 2 storefront entry and reduce mechanical screen. for electrical - provide raceway routing, revise location of pg&e transformer and add exterior lighting. fire alarm and sprinkler on sep permit.Details
revision to pa 201711284984. revise stair 6 layout, add curb at storefront, add canopy at level 2 storefront entry and reduce mechanical screen. for electrical - provide raceway routing, revise location of pg&e transformer and add exterior lighting. fire alarm and sprinkler on sep permit. | $10,000 |
| Feb 20, 2018 | Completed final sign-off Sep 2021 | 3251 20th Av | renovate mall interior -reconfigure common area adjacent to anchor building- stairs, ramps, new floor openingsDetails
renovate mall interior -reconfigure common area adjacent to anchor building- stairs, ramps, new floor openings | $6,697,016 |
| Nov 28, 2017 | Completed final sign-off Oct 2021 | 400 Winston Dr | demo of non-bearing partitions, ceilings and equipment, slab opening & bearing concrete walls and interior improvement of common areas in anchor building. addition of vertical circulation. tenant improvements, metal stairs, buckling restrained systems, open wed steel joist under separate appl.Details
demo of non-bearing partitions, ceilings and equipment, slab opening & bearing concrete walls and interior improvement of common areas in anchor building. addition of vertical circulation. tenant improvements, metal stairs, buckling restrained systems, open wed steel joist under separate appl. | $14,455,759 |