Back to bathroom remodel contractors
Van Acker Const Assoc Inc
- Based in
- Mill Valley
- On San Francisco permits
- Dec 2001 to Sep 2026
- Last 24 months
- 19 permits filed
314 permits since 2000: 181 completed, 20 in progress, 65 never finaled, 48 expired or cancelled.
Of the 65 never-finaled permits, 2 are 3 to 5 years old, 13 are 5 to 10 years old, 50 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
38 bathroom remodel permits: 22 completed, 2 in progress, 11 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 373 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2024 | In progress issued Dec 2024 | 2799 Broadway | revision to existing permit#2024-1105-4446 issued on 11/05/2024. remodel (3) additional baths, electrical upgrades on the 3rd ,4th, and 5th levels, and bath fan(s) included, new cabinetry. no structural modifications or sprinkler head adjustments. no alteration of wall,window or door.Details
revision to existing permit#2024-1105-4446 issued on 11/05/2024. remodel (3) additional baths, electrical upgrades on the 3rd ,4th, and 5th levels, and bath fan(s) included, new cabinetry. no structural modifications or sprinkler head adjustments. no alteration of wall,window or door. | $200,000 |
| Nov 5, 2024 | In progress issued Nov 2024 | 2799 Broadway | remodel of (e) kitchen/great room, primary bathroom and guest bathroom for remodel with (n) cabinetry, plumbing fixtures and finishes. no structural, layout or wall removal .Details
remodel of (e) kitchen/great room, primary bathroom and guest bathroom for remodel with (n) cabinetry, plumbing fixtures and finishes. no structural, layout or wall removal . | $20,000 |
| Oct 19, 2023 | Completed final sign-off Oct 2024 | 2660 Scott St | 3/f: revision to no-plan permit 202309277554. interior remodel on 3/f. bathroom to be converted into closet. existing bedroom to be converted into bathroom. wall in (e) bedroom to be removed-not a structural wall, no shear wall or posts. no work in the prow.Details
3/f: revision to no-plan permit 202309277554. interior remodel on 3/f. bathroom to be converted into closet. existing bedroom to be converted into bathroom. wall in (e) bedroom to be removed-not a structural wall, no shear wall or posts. no work in the prow. | |
| Sep 27, 2023 | Completed final sign-off Oct 2024 | 2660 Scott St | bathroom and closet remodel. bathroom and closet to be replaced in place and in kind. no walls to be moved. closet approx. 100 sq.ft. bathroom approx. 100 sq.ft. no walls to be moved.Details
bathroom and closet remodel. bathroom and closet to be replaced in place and in kind. no walls to be moved. closet approx. 100 sq.ft. bathroom approx. 100 sq.ft. no walls to be moved. | $75,000 |
| Feb 2, 2023 | Completed final sign-off Mar 2024 | 3673 Jackson St | remodel (3) bathrooms: primary bath, 4rd floor bath and powder room. all plumbing and electrical fixtures to be replaced.Details
remodel (3) bathrooms: primary bath, 4rd floor bath and powder room. all plumbing and electrical fixtures to be replaced. | $55,000 |
| Sep 9, 2022 | Completed final sign-off Oct 2023 | 1221 Jones St | penthouse c3: reconfigure int non structural partition walls. remodel 2 1/2 baths, replace all plumbing, appliances, int lighting, int doorsDetails
penthouse c3: reconfigure int non structural partition walls. remodel 2 1/2 baths, replace all plumbing, appliances, int lighting, int doors | $100,000 |
| Jun 10, 2021 | Completed final sign-off Aug 2021 | 3421 Jackson St | revision to pa #202104017691 - renovate 3/f including the addition of one new bathroom. alteration of two existing bathroomsDetails
revision to pa #202104017691 - renovate 3/f including the addition of one new bathroom. alteration of two existing bathrooms | $200,000 |
| Apr 1, 2021 | Completed final sign-off Aug 2021 | 3421 Jackson St | in-kind bathroom remodel at 2 bathrooms at 3/f. replace carpet with hardwood flooring at 3/f. replce trim and finishes on 3/f.Details
in-kind bathroom remodel at 2 bathrooms at 3/f. replace carpet with hardwood flooring at 3/f. replce trim and finishes on 3/f. | $80,000 |
| Dec 16, 2020 | Never finaled issued Dec 2020, no final | 100 Spruce St | remodel four bathrooms in kind, bath finishes replaced, interior floor replaced, painting no change to layout walls or openingsDetails
remodel four bathrooms in kind, bath finishes replaced, interior floor replaced, painting no change to layout walls or openings | $100,000 |
| Mar 21, 2019 | Completed final sign-off May 2021 | 188 Minna St | #38a demo bath 2 & reconfigure walls for (n) master closet various changes to plumbing, electrical, lighting. (n) millwork & finishes, fixtures.Details
#38a demo bath 2 & reconfigure walls for (n) master closet various changes to plumbing, electrical, lighting. (n) millwork & finishes, fixtures. | $750,000 |
| Sep 4, 2018 | Completed final sign-off Oct 2020 | 147 Laidley St | revision to pa# 2017-1023-1946. interior only renovations of kitchen , master bathroom, closets and crawl space. replacement of (e) deck, comprising less than 50% replacement.Details
revision to pa# 2017-1023-1946. interior only renovations of kitchen , master bathroom, closets and crawl space. replacement of (e) deck, comprising less than 50% replacement. | $65,000 |
| Apr 13, 2018 | Completed final sign-off Feb 2019 | 3214 Jackson St | replace finishes in master bedroom and bathroom. replace windows at master bedroom.Details
replace finishes in master bedroom and bathroom. replace windows at master bedroom. | $1,000 |
| Jan 9, 2018 | Completed final sign-off Dec 2020 | 2006 Washington St | unit #8: reconfigure interio partition walls, remodel kitchen and all baths. replace exterior windows in kind. no changes to size and design of windows. no changes to exteriorDetails
unit #8: reconfigure interio partition walls, remodel kitchen and all baths. replace exterior windows in kind. no changes to size and design of windows. no changes to exterior | $1,647,000 |
| Apr 27, 2016 | Completed final sign-off Oct 2020 | 131 10th Av | 2 kitchen & 2 bathroom remodeling in-kind. fence repair /landscape in rear yeard, relocate interior door at the rear stairwell.Details
2 kitchen & 2 bathroom remodeling in-kind. fence repair /landscape in rear yeard, relocate interior door at the rear stairwell. | $300,000 |
| Mar 18, 2016 | Never finaled issued Apr 2016, no final | 2974 Pacific Av | interior remodel, demo non bearing wall, (n) kitchen, (n) bath, enlarge (e) 1st floor laundry for (n) boiler & (n) h20 storage tank. voluntary seismic upgrade.Details
interior remodel, demo non bearing wall, (n) kitchen, (n) bath, enlarge (e) 1st floor laundry for (n) boiler & (n) h20 storage tank. voluntary seismic upgrade. | $95,000 |
| Mar 23, 2015 | Never finaled issued Mar 2015, no final | 2520 Pacific Av | exploratory soft demo on all floors in advance of t.i., kitchen & baths onlyDetails
exploratory soft demo on all floors in advance of t.i., kitchen & baths only | $5,000 |
| Feb 13, 2015 | Never finaled issued Feb 2015, no final | 235 Seacliff Av | interior remodel, remodel kitchen & baths,replace interior stair with compliant stairs, replace exterior stucco in kind, replace all windows in kind, wood sashes typical. new fenestration configuration at rear elevation,not visible from public right of way. replace front door,remove (e) attachedDetails
interior remodel, remodel kitchen & baths,replace interior stair with compliant stairs, replace exterior stucco in kind, replace all windows in kind, wood sashes typical. new fenestration configuration at rear elevation,not visible from public right of way. replace front door,remove (e) attached | $350,000 |
| Feb 12, 2015 | Completed final sign-off Jun 2015 | 2920 Broadway | revision to approved pa 201411212281, all work on lower level, scope is to combine 2 (e) bathrooms into one, remove sauna & combine (e) study and laundry into one room.Details
revision to approved pa 201411212281, all work on lower level, scope is to combine 2 (e) bathrooms into one, remove sauna & combine (e) study and laundry into one room. | $30,000 |
| Nov 21, 2014 | Completed final sign-off Jun 2015 | 2920 Broadway | interior ti renovate fixtures, appliances, 6 bathrooms, 2 powder rooms, infill and removal of lower level addition. convert lower level rooms to storage. upgrade light fixtures and finishes throughout. no structural work.Details
interior ti renovate fixtures, appliances, 6 bathrooms, 2 powder rooms, infill and removal of lower level addition. convert lower level rooms to storage. upgrade light fixtures and finishes throughout. no structural work. | $165,000 |
| Jun 13, 2014 | Completed final sign-off Apr 2015 | 560 Alabama St | revision to app#201307252799. replace all windows in kind. enlarge ada bathrooms, break room, mechanical room, and offices on the second floor. new lighting through out. n/a for maher ordinance #155-13Details
revision to app#201307252799. replace all windows in kind. enlarge ada bathrooms, break room, mechanical room, and offices on the second floor. new lighting through out. n/a for maher ordinance #155-13 | $60,000 |
| Dec 19, 2013 | Completed final sign-off Dec 2015 | 15 Arguello Bl | remodel 2nd fl kitchen, 2 1st fl baths, 2 2nd fl baths, 5 3rd fl bath. replace in kind. ceiling, sheetrock, some wall sheetrock. upgrade partial elec and plumbing. lighting to comply with cec 150 k. insulate walls and ceilings. no walls to be removed, added, or moved. all loyouts to remain the same.Details
remodel 2nd fl kitchen, 2 1st fl baths, 2 2nd fl baths, 5 3rd fl bath. replace in kind. ceiling, sheetrock, some wall sheetrock. upgrade partial elec and plumbing. lighting to comply with cec 150 k. insulate walls and ceilings. no walls to be removed, added, or moved. all loyouts to remain the same. | $170,000 |
| Oct 18, 2013 | Never finaled issued Mar 2014, no final | 2845 Broadway | interior renovation. work will include (n) kitchen, bathrooms, living room, bedrooms, (n) finishes, casework, lighting, structural work. add other rooms. all exterior work under separate permit. compliance with ordinance no. 155-13 not required.Details
interior renovation. work will include (n) kitchen, bathrooms, living room, bedrooms, (n) finishes, casework, lighting, structural work. add other rooms. all exterior work under separate permit. compliance with ordinance no. 155-13 not required. | $500,000 |
| Jul 5, 2013 | Never finaled issued Jul 2013, no final | 42 Hotaling Pl | relocation of kitchen and master bath, replace fixtures and finishes.Details
relocation of kitchen and master bath, replace fixtures and finishes. | $250,000 |
| May 7, 2013 | Never finaled issued May 2013, no final | 42 Hotaling Pl | remodel bathroom, replace fixtures & finishes.Details
remodel bathroom, replace fixtures & finishes. | $10,000 |
| May 2, 2013 | Completed final sign-off Oct 2013 | 1940 Broadway | remodel master bathroom, kitchen. update bathroom fixtures. convert 4th bedroom into a library. refinish floor, repaint walls & ceilingDetails
remodel master bathroom, kitchen. update bathroom fixtures. convert 4th bedroom into a library. refinish floor, repaint walls & ceiling | $300,000 |
| Oct 23, 2012 | Expired or cancelled expired Feb 2017 | 2808 Broadway | interior finishes/fixtures replacement in kind: replace kitchen cabinets, plumbing fixtures, vanity cabinets & carpeting. remove 11 exploratory openings in gwb wall & ceilings, patch & repair in kind. no exterior work,no struct work,no work on prop line walls, total 3 bathrooms & 1 kitchen.Details
interior finishes/fixtures replacement in kind: replace kitchen cabinets, plumbing fixtures, vanity cabinets & carpeting. remove 11 exploratory openings in gwb wall & ceilings, patch & repair in kind. no exterior work,no struct work,no work on prop line walls, total 3 bathrooms & 1 kitchen. | $33,750 |
| Mar 15, 2012 | Never finaled issued May 2012, no final | 75 Lansing St | demo (e) kitchen, bathroom, interior finishes, stairs & roof deck. no structural work. remodel & construction will be performed under pa# 2012-0315-6172Details
demo (e) kitchen, bathroom, interior finishes, stairs & roof deck. no structural work. remodel & construction will be performed under pa# 2012-0315-6172 | $5,000 |
| Mar 15, 2012 | Completed final sign-off Jul 2014 | 75 Lansing St | remodel kitchen, bath, finishes & stair; remodel stair to roof; remodel roofing & roof deck; remodel laundry room. sprinkler separate permit.Details
remodel kitchen, bath, finishes & stair; remodel stair to roof; remodel roofing & roof deck; remodel laundry room. sprinkler separate permit. | $500,000 |
| Jun 8, 2011 | Never finaled issued Jul 2011, no final | 2600 Pacific Av | interior alterations to garage, basement, 1st and 2nd floors including new kitchen, baths and stairs. addition at basement for powder room and storage. no exterior alterationsDetails
interior alterations to garage, basement, 1st and 2nd floors including new kitchen, baths and stairs. addition at basement for powder room and storage. no exterior alterations | $700,000 |
| Sep 23, 2010 | Completed final sign-off Nov 2011 | 765 Market St | finish changes, bath & kitchen remodel, interior wall & ceiling modifications, millwork & demising wall modification to connect ajoining units for single tenant occupancy w/ new fire rated door assemblies.(e) exits to remain.1 hr separation between units to be maintained.unit b,c,d will remainDetails
finish changes, bath & kitchen remodel, interior wall & ceiling modifications, millwork & demising wall modification to connect ajoining units for single tenant occupancy w/ new fire rated door assemblies.(e) exits to remain.1 hr separation between units to be maintained.unit b,c,d will remain | $900,000 |
| Jun 3, 2010 | Never finaled issued Jun 2010, no final | 3690 Washington St | interior alterations-third flr.: bedroom/bathroom remodel, new lighting & new finishes. no structural work, no exterior scope of work. no envelope modifications. no mechanical or water heating system alterations.Details
interior alterations-third flr.: bedroom/bathroom remodel, new lighting & new finishes. no structural work, no exterior scope of work. no envelope modifications. no mechanical or water heating system alterations. | $150,000 |
| May 19, 2008 | Completed final sign-off Dec 2009 | 2255 Lyon St | remodel of all 4 (e)floors including remove/replace baths & add (1) bath,remove/enlarge (2)windows,add (3)new windows,new walls, plbg,mech,elec,lighting, reconfiguration & addition of some struct elements,conditioning of previously unexcavated,mostly subgrade area within (e) bldg footprint,reroofingDetails
remodel of all 4 (e)floors including remove/replace baths & add (1) bath,remove/enlarge (2)windows,add (3)new windows,new walls, plbg,mech,elec,lighting, reconfiguration & addition of some struct elements,conditioning of previously unexcavated,mostly subgrade area within (e) bldg footprint,reroofing | $1,500,000 |
| Apr 29, 2008 | Completed final sign-off Oct 2008 | 1000 Mason St | #1001- interior remodel of single apartment unit-no structural work, minimal demo and new interior partitions. replace plmg fixtures in extg bathrooms, 1 shower to replace 2. kitchen remodel. remove some extg flooring to exposed extg wood floor below and install nw wood floor in some areaDetails
#1001- interior remodel of single apartment unit-no structural work, minimal demo and new interior partitions. replace plmg fixtures in extg bathrooms, 1 shower to replace 2. kitchen remodel. remove some extg flooring to exposed extg wood floor below and install nw wood floor in some area | $100,000 |
| Jun 8, 2007 | Expired or cancelled expired Oct 2008 | 2825 Broadway | reconfiguration of powder rm and bath finishes excavation and addition of storage space all work on basement level of house revis to app #200704068249Details
reconfiguration of powder rm and bath finishes excavation and addition of storage space all work on basement level of house revis to app #200704068249 | $35,000 |
| Dec 13, 2006 | Never finaled issued May 2007, no final | 3799 Washington St | enlarge existing sunroom @ 1/fl. add 1 new bedroom & 2 new bathrooms @ 2/fl.Details
enlarge existing sunroom @ 1/fl. add 1 new bedroom & 2 new bathrooms @ 2/fl. | $1,500,000 |
| Jan 24, 2006 | Completed final sign-off May 2007 | 3277 Pacific Av | replace bathroom finishes in kindDetails
replace bathroom finishes in kind | $50,000 |
| Aug 9, 2005 | Completed final sign-off Feb 2006 | 1200 California St | replace finishes in kind, in uni 12c (entire unit) wall finishes-(1) kitchen remodel, (3) bath remodDetails
replace finishes in kind, in uni 12c (entire unit) wall finishes-(1) kitchen remodel, (3) bath remod | $100,000 |
| Apr 27, 2005 | Expired or cancelled expired Jan 2008 | 2920 Broadway | remodel 5 1/2 bthrms: add new bath 2nd fl, remoe spiral staircase in full opening to match existing/Details
remodel 5 1/2 bthrms: add new bath 2nd fl, remoe spiral staircase in full opening to match existing/ | $1,000,000 |