Valley Restoration Services Inc
- Based in
- Bakersfield
- On San Francisco permits
- Feb 2023 to Nov 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 1 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 6 days from filing to permit and 169 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2024 | Completed final sign-off Feb 2025 | 1364 Underwood Av | replace ceiling drywall, paint, replace stucco on front porch; replace window on porch entry (exterior side of stairs); install 2x6 per plans on upper part of residence; replace roof cevering @ porch and rear (2 squares total) (small fire repair) install insulation in atticDetails
replace ceiling drywall, paint, replace stucco on front porch; replace window on porch entry (exterior side of stairs); install 2x6 per plans on upper part of residence; replace roof cevering @ porch and rear (2 squares total) (small fire repair) install insulation in attic | $50,000 |