Valex Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2004 to Jul 2026
- Last 24 months
- 6 permits filed
100 permits since 2000: 96 completed, 2 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 6 completed, 1 in progress. Typically 37 days from filing to permit and 256 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2026 | In progress filed Jul 2026, not yet issued | 866 35th Av | addition 402sf rear yard and remodel (e) home. new deck and new stairs to backyard. renovation and expansion of the kitchen on 1/f. construction of 1/2 bathroom on 1/f. renovation of 2/f to add 1 bedroom and 2 baths, walk-in closet and laundry.Details
addition 402sf rear yard and remodel (e) home. new deck and new stairs to backyard. renovation and expansion of the kitchen on 1/f. construction of 1/2 bathroom on 1/f. renovation of 2/f to add 1 bedroom and 2 baths, walk-in closet and laundry. | $400,000 |
| Aug 30, 2024 | Completed final sign-off Jun 2025 | 115 Otsego Av | 1st fl: add a bedroom, a family room with a wet bar & bathroom 2nd fl: relocate interior stair and add a powder roomDetails
1st fl: add a bedroom, a family room with a wet bar & bathroom 2nd fl: relocate interior stair and add a powder room | $80,000 |
| Nov 10, 2022 | Completed final sign-off Feb 2026 | 1834 32nd Av | 1st level:convert 554 sf of(e)non-conditioned area to a conditioned bedroom,family room,a bath &(n)stairs connecting to fl above.(n)window & door to rear of house.2nd level:(n)99 sf additon to the rear of the house,(e)bath to be renovated,1 additional bath added.Details
1st level:convert 554 sf of(e)non-conditioned area to a conditioned bedroom,family room,a bath &(n)stairs connecting to fl above.(n)window & door to rear of house.2nd level:(n)99 sf additon to the rear of the house,(e)bath to be renovated,1 additional bath added. | $185,000 |
| Nov 19, 2020 | Completed final sign-off Feb 2022 | 124 Otsego Av | in 2nd flr: remodel existing kitchen and bathroom. add a skylight above bathroom. add a stair to backyardDetails
in 2nd flr: remodel existing kitchen and bathroom. add a skylight above bathroom. add a stair to backyard | $28,000 |
| Jul 27, 2016 | Completed final sign-off Mar 2017 | 445 Kirkham St | interior remodel to include new bathroom & new kitchen island. one exterior door ot replace existing window. repair interior stair to replace existing. new bathroom on ground floor.Details
interior remodel to include new bathroom & new kitchen island. one exterior door ot replace existing window. repair interior stair to replace existing. new bathroom on ground floor. | $95,000 |
| Sep 10, 2008 | Completed final sign-off Dec 2008 | 1527 21st Av | ground floor remodel: remove e bdrm,storage,toilet rm. create 2 bedrooms, 1 full bath, 1 study room w/wet bar, 1 family room. new furnace, railing at int stairs, relocate laundry. storage and utility room adjacent to garage. french doors.Details
ground floor remodel: remove e bdrm,storage,toilet rm. create 2 bedrooms, 1 full bath, 1 study room w/wet bar, 1 family room. new furnace, railing at int stairs, relocate laundry. storage and utility room adjacent to garage. french doors. | $38,000 |
| Dec 18, 2007 | Completed final sign-off Aug 2008 | 16 Merced Av | 1st flr improvement of existing vacant space:2 bedrooms, sunroom, 2 bathrooms, entertainment room, wine cellar, sauna room. 2nd fl:remodel foyer, kitchen, bath, add 2nd bath to provide interconnecting stairs btwn 2 floors,work within(e)envelope,infill windowDetails
1st flr improvement of existing vacant space:2 bedrooms, sunroom, 2 bathrooms, entertainment room, wine cellar, sauna room. 2nd fl:remodel foyer, kitchen, bath, add 2nd bath to provide interconnecting stairs btwn 2 floors,work within(e)envelope,infill window | $105,000 |